[1]朱东飞,郑生全.城市轨道交通折返站的设计[J].城市轨道交通研究,2015,18(Z2):14-18.
Zhu Dongfei, Zheng Shengquan. Design of Urban Rail Transit Turn-back Station[J]. Urban Mass Transit, 2015, 18(Z2): 14-18.
[2]张文正.城市轨道交通折返线型式比较研究[J].隧道建设(中英文),2020,40(S1):270-277.
Zhang Wenzheng. Comparative Study on Reentry Line Types of Urban Rail Transit[J]. Tunnel Construction, 2020, 40(S1): 270-277.
[3]于丽颖.浅析城市轨道交通车站折返线设置方案[J].科技创新与应用,2013,3(36):22-23.
Yu Liying. Analysis on the Setting Scheme of Turn-back Line in Urban Rail Transit Station[J]. Technology Innovation and Application, 2013, 3(36): 22-23.
[4]王京峰,惠伦.地铁站前折返能力分析[J].石家庄铁道学院学报(自然科学版),2008,21(1):26-30.
Wang Jingfeng, Hui Lun. Analysis on Station-Front Turning-back Capacity[J]. Journal of Shijiazhuang Railway Institute (Natural Science), 2008, 21(1): 26-30.
[5]李婷.站前折返与站后折返的折返能力分析[J].流体测量与控制,2021,2(2):26-29.
Li Ting. Analysis of Turn-back Ability of Turn-back before and after Station[J]. Fluid Measurement & Control, 2021, 2(2): 26-29.
[6]李俊芳,樊晓梅.城市轨道交通车站折返能力计算[J].铁道运输与经济,2009,31(5):50-53.
Li Junfang, Fan Xiaomei. Turning-back Capacity Calculation of Urban Mass Transit Station[J]. Railway Transport and Economy, 2009, 31(5): 50-53.
[7]丁伟,李爱东,汤杰,等.城市轨道交通折返能力分析及优化措施[J].交通科技与经济,2021,23(1):59-66.
Ding Wei, Li Aidong, Tang Jie, et al. Analysis on Turnaround Capacity of Urban Rail Transit Line and Its Optimization Measures[J]. Technology & Economy in Areas of Communications, 2021, 23(1): 59-66.
[8]吴培栋,王硕,张友兵.高速铁路ATO系统增加自动折返功能的方案研究及实验验证[J].铁路通信信号工程技术,2023,20(8):1-7.
Wu Peidong, Wang Shuo, Zhang Youbing. Research on Scheme and Experimental Verification of Adding Automatic Turn-back Function Based on High-speed Railway ATO[J]. Railway Signalling & Communication Engineering, 2023, 20(8): 1-7.
[9]赵寅龙.GSM-R线路交叉区域异常占用引起CTCS-3降级分析与优化[J].铁路通信信号工程技术,2023,20(1):40-45.
Zhao Yinlong. Analysis and Optimization of CTCS-3 Degradation Faults Caused by Abnormal Occupancy in GSM-R Line Crossing Area[J]. Railway Signalling & Communication Engineering, 2023, 20(1): 40-45.
[10]潘琢,崔衍渠,谭彬,等.CTCS-2信号系统下城际铁路折返能力研究[J].铁道工程学报,2022,39(4):59-66.
Pan Zhuo, Cui Yanqu, Tan Bin, et al. Research on the Return Capacity of Intercity Railway under CTCS-2 Signal System[J]. Journal of Railway Engineering Society, 2022, 39(4): 59-66.
[11]崔佳诺.市域铁路列车自动折返效率提升方法研究[J].铁道标准设计,2024,68(5):165-169,188.
Cui Jianuo. Research on the Method of Improving the Efficiency of Automatic Turn back of Trains on Suburban Railways[J]. Railway Standard Design, 2024, 68(5): 165-169, 188.
[12]徐意.城市轨道交通线路折返能力分析及优化措施[J].铁道运输与经济,2017,39(3):96-102.
Xu Yi. Analysis on Turnaround Capacity of Urban Rail Transit Line and Its Optimization Measures[J]. Railway Transport and Economy, 2017, 39(3): 96-102.
[13]项仲强,施莉娟.上海轨道交通1号线富锦路站折返能力分析[J].城市轨道交通研究,2023,26(9):209-213.
Xiang Zhongqiang, Shi Lijuan. Analysis of Shanghai Rail Transit Line 1 Turn-back Capacity at Fujin Road Station[J]. Urban Mass Transit, 2023, 26(9): 209-213.
[14]江志彬,饶娅.多股道城市轨道交通车站站前折返能力分析[J].同济大学学报(自然科学版),2017,45(9):1328-1335.
Jiang Zhibin, Rao Ya. Turnback Capacity Assessment at Rail Transit Stubend Terminal with Multi-Tracks[J]. Journal of Tongji University (Natural Science), 2017, 45(9): 1328-1335.
[15]招阳,王丽,时瑾,等.城市轨道交通站前交叉渡线折返能力影响因素分析[J].现代交通技术,2013,10(2):85-87.
Zhao Yang, Wang Li, Shi Jin, et al. Analysis of Turn-back Capacity of Scissors Crossing in Front of Station in Urban Mass Transit System[J]. Modern Transportation Technology, 2013, 10(2): 85-87.
[16]陈骏,袁江,王芳玲.设置站前交叉渡线初期终点站的近远期折返能力适应性研究:以南宁地铁2号线2期工程坛泽站为例[J].隧道建设(中英文),2020,40(3):389-396.
Chen Jun, Yuan Jiang, Wang Fangling. Adaptability of Short-Term and Long-Term Turnback Capacity of Preliminary Terminal with Double Crossover: a Case Study on Tanze Station of Phase 2 Project of Nanning Metro Line No.2[J]. Tunnel Construction, 2020, 40(3): 389-396.
[17]李永恒.苏州轨道交通终点站配线形式研究[J].工程技术研究,2023,8(21):165-168.
Li Yongheng. Research on the Wiring Form of Suzhou Rail Transit Terminal Station[J]. Engineering and Technological Research, 2023, 8(21): 165-168.
[18]程雯.北京地铁6号线五路居站道岔型号及折返能力分析[J].铁道标准设计,2013,57(1):13-16.
Cheng Wen. Analysis on Turnout Model and Turn-back Ability of Wuluju Station of Beijing Metro Line 6[J]. Railway Standard Design, 2013, 57(1): 13-16.
[19]江明,张万强,张嘉扬.列车追踪间隔时间的分解及影响分析[J].铁路通信信号工程技术,2023,20(7):1-9.
Jiang Ming, Zhang Wanqiang, Zhang Jiayang. Decomposition of Train Tracking Interval and Its Impact Analysis[J]. Railway Signalling & Communication Engineering, 2023, 20(7): 1-9.
[20]李亚兰.一站两场场间渡线道岔场联电路设计[J].铁路通信信号工程技术,2023,20(3):23-26.
Li Yalan. Design of Liaison Circuit for Crossover Turnout Between Yards of Station with Two Yards[J]. Railway Signalling & Communication Engineering, 2023, 20(3): 23-26.
[21]张奔.大运量城市轨道交通折返站折返能力分析及优化设计研究[D].北京:北京交通大学,2011.
[22]刘润招.城市轨道交通双渡线折返站折返能力优化研究[D].北京:北京交通大学,2010.
[23]国家市场监督管理总局,国家标准化管理委员会.城市轨道交通运营技术规范:GB/T 38707-2020[S].北京:中国标准出版社,2020.
|