[1]禹志阳.高速铁路信号系统测试技术研究及展望[J].铁道通信信号,2019,55(S1):137-141.
Yu Zhiyang. Research and Prospect on Test Technology for the Signaling System in High-Speed Railway[J]. Railway Signalling & Communication, 2019, 55(S1): 137-141.
[2]中华人民共和国铁道部.高速铁路工程动态验收技术规范:TB 10761-2013[S].北京:中国铁道出版社,2013.
[3] 中国铁路总公司.高速铁路联调联试及运行试验技术规范:Q/CR 472-2015[S].北京:中国铁道出版社,2015.
[4]禹志阳,陈晓明,霍黎明.高速铁路信号系统联调联试技术发展新思路[J].铁路技术创新,2021(3):45-50.
Yu Zhiyang, Chen Xiaoming, Huo Liming. New Thoughts for Development of Testing and Commissioning Technology of High Speed Railway Signal System[J]. Railway Technical Innovation, 2021(3): 45-50.
[5]张秀广.高速铁路通信信号系统联调联试关键技术[J].铁路通信信号工程技术,2011,8(6):1-6.
Zhang Xiuguang. Key Technology of Integrated Commissioning and Testing of Communication & Signal Systems for High-Speed Railways[J]. Railway Signalling & Communication Engineering, 2011, 8(6): 1-6.
[6]郜新军.高速铁路信号系统联调联试典型问题[J].中国安全科学学报,2022,32(S1):152-156.
Gao Xinjun. Typical Problems for Integration Testing Commissioning of High-Speed Railway Signal System[J]. China Safety Science Journal, 2022, 32(S1): 152-156.
[7]易承龙.武广高铁RBC改造方案研究[J].铁道通信信号,2021,57(1):5-8,12.
Yi Chenglong. Research on Renovation Scheme of Radio Block Center in Wuhan-Guangzhou High-Speed Railway[J]. Railway Signalling & Communication, 2021, 57(1): 5-8, 12.
[8]金鑫.关于武广高铁列控系统达标改造工程达标范围的研究[J].铁路通信信号工程技术,2020,17(11):111-116.
Jin Xin. Research on Compliance Range of Reaching Standard Reconstruction Project of Wuhan-Guangzhou High-Speed Railway Train Control System[J]. Railway Signalling & Communication Engineering, 2020, 17(11): 111-116.
[9]王嵩,赵海宁,岳剑勇,等.成渝高铁提质达标检测试验组织创新实践研究[J].铁路技术创新,2021(3):135-139.
Wang Song, Zhao Haining, Yue Jianyong, et al. Research on Organization and Innovation for Inspection and Test of Chengdu-Chongqing HSR Quality Improvement and Standard Conformation[J]. Railway Technical Innovation, 2021(3): 135-139.
[10]王勇,李东亮,朱文平.京津城际铁路信号系统升级改造技术[J].铁路通信信号工程技术,2020,17(3):39-43,67.
Wang Yong, Li Dongliang, Zhu Wenping. Signal System Upgrading Technology of Beijing-Tianjin Intercity Railway[J]. Railway Signalling & Communication Engineering, 2020, 17(3): 39-43, 67.
[11]周永健,刘德超,李万生,等.联调联试中列控系统兼容性问题探讨[J].铁道通信信号,2020,56(5):25-29.
Zhou Yongjian, Liu Dechao, Li Wansheng, et al. Problem Discussion about Compatibility of Train Control System during Integration Test and Commissioning[J]. Railway Signalling & Communication, 2020, 56(5): 25-29.
[12] 郜新军,王文涛,周永健,等.高铁列控系统大号码道岔试验场景研究[J].铁路通信信号工程技术,2021,18(4):1-4.
Gao Xinjun, Wang Wentao, Zhou Yongjian, et al. Research on Test Scene of Large-Number Turnout for High Speed Railway Train Control System[J]. Railway Signalling & Communication Engineering, 2021, 18(4): 1-4.
[13]中国国家铁路集团有限公司.CTCS-3级列控系统测试案例:TJ/DW 124-2020[S].北京:中国国家铁路集团有限公司,2020.
[14]张纪周,赵聪州,张碧峰,等.列控系统动态检测装置研制[J].铁道通信信号,2020,56(7):15-21.
Zhang Jizhou, Zhao Congzhou, Zhang Bifeng, et al. Development and Manufacture of Dynamic Detection Device for Train Control System[J]. Railway Signalling & Communication, 2020, 56(7): 15-21.
|