[1]陈通.复杂条件下地铁CBTC信号系统接入既有线的解决方案[J].铁路通信信号工程技术,2024,21(3):69-72.
Chen Tong. Solution for Connecting CBTC System to Existing Line under Complex Conditions[J]. Railway Signalling & Communication Engineering, 2024, 21(3): 69-72.
[2]裴立原.城市轨道交通Y形线路信号系统拆分改造方案[J].铁路通信信号工程技术,2023,20(11):85-91.
Pei Liyuan. Splitting and Transformation Scheme of Signaling System for Y-Shaped Line in Urban Rail Transit[J]. Railway Signalling & Communication Engineering, 2023, 20(11): 85-91.
[3]刘冬冬,周祎,施宇锋,等.苏州轨道交通11号
线与3号线贯通运营信号系统改造关键技术方案[J].城市轨道交通研究,2024,27(12):356-359.
Liu Dongdong, Zhou Yi, Shi Yufeng, et al. Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation[J]. Urban Mass Transit, 2024, 27(12): 356-359.
[4]孙瑶,李新,沈丙耐.苏州轨道交通3号线与11号线贯通运营信号系统改造方案[J].城市轨道交通研究,2024,27(10):322-325.
Sun Yao, Li Xin, Shen Bingnai. Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 through Train Operation[J]. Urban Mass Transit, 2024, 27(10): 322-325.
[5]陈光.基于贯通运营的地铁延伸段信号系统设计及改造[J].城市轨道交通研究,2018,21(9):139-141.
Chen Guang. Design and Reform of Metro Signal System on the Extension Line Based on Official Operation[J]. Urban Mass Transit, 2018, 21(9): 139-141.
[6]刘秋生.城市轨道交通延伸段信号工程设计探讨[J].现代城市轨道交通,2016(2):12-14.
Liu Qiusheng. Discussion on Signaling Engineering Design for Transit Extension Line[J]. Modern Urban Transit, 2016(2): 12-14.
[7]梁波,郑旻,蔡长江.既有线信号系统改造新旧
联锁设备倒切方案研究[J].交通与运输,2023,39(6):38-42.
Liang Bo, Zheng Min, Cai Changjiang. Switching Scheme of Old and New Interlocking Equipment in the Transformation of Existing Line Signal System[J]. Traffic & Transportation, 2023, 39(6): 38-42.
[8]邹强.城市轨道交通延伸线工程信号系统过渡改造方案分析[J].现代城市轨道交通,2019(9):53-56.
Zou Qiang. Analysis of Transitional Rehabilitation Scheme for Signaling System of Urban Rail Transit Extension Line Project[J]. Modern Urban Transit, 2019(9): 53-56.
[9]宋煜炜,肖克,白永杰.城市轨道交通信号系统临时控制中心方案研究[J]. 铁路通信信号工程技术,2024,21(6):102-109.
Song Yuwei, Xiao Ke, Bai Yongjie. Research on Schemes for Temporary Operation Control Center of Urban Rail Transit Signaling System[J]. Railway Signalling & Communication Engineering, 2024, 21(6): 102-109.
[10]徐成永,李天石,张小伟.市区线与郊区线贯通运营实践与思考:以北京地铁1号线与八通线为例[J].都市快轨交通,2023,36(4):136-145.
Xu Chengyong, Li Tianshi, Zhang Xiaowei. Pass-through Operation Implementation Plan for Urban and Suburban Metros:Practice and Thoughts from Beijing Metro Line 1 and Batong Line[J]. Urban Rapid Rail Transit, 2023, 36(4): 136-145.
[11]刘冬冬,唐陶.基于地铁CBTC信号系统的延伸预留设计方案[J].铁路通信信号工程技术,2023,20(11):97-101.
Liu Dongdong, Tang Tao. Research on Reservation Design Scheme for Extension Based on Urban Rail Transit CBTC Signaling System[J]. Railway Signalling & Communication Engineering, 2023, 20(11): 97-101.
[12]张赟昀.城市轨道交通信号系统贯通设计方案研究[J].现代城市轨道交通,2020(12):42-47.
Zhang Yunyun. Research on through Design Scheme of Urban Rail Transit Signaling System[J]. Modern Urban Transit, 2020(12): 42-47.
[13]张伟.城市轨道交通线路分段开通信号系统贯通调试的技术研究[J].铁路计算机应用,2017,26(10):45-48.
Zhang Wei. Signal System through Testing Technology for Section Opening of Urban Rail Transit[J]. Railway Computer Application, 2017, 26(10): 45-48.
[14]储海平,孙克寒.上海轨道交通13号线北翟路停车场信号系统改造倒接方案[J].城市轨道交通研究,2024,27(11):103-106.
Chu Haiping, Sun Kehan. Signaling System Retrofit and Reverse-connection Scheme for Shanghai Rail Transit Line 13 Beidi Road Depot [J]. Urban Mass Transit, 2024, 27(11): 103-106.
[15]吴刚.地铁分段开通接驳车站信号系统设计方案分析[J].机电工程技术,2018,47(7):138-140.
Wu Gang. Analysis of Signal System Design for Feeder Station in Segment Opening Subway Lines[J]. Mechanical & Electrical Engineering Technology, 2018, 47(7): 138-140.
[16]靳国锋,张代玉.城市轨道交通既有车辆段信号系统改造的联锁接口方案[J].城市轨道交通研究,2024,27(4):233-237.
Jin Guofeng, Zhang Daiyu. Interlocking Interface Scheme for Urban Rail Transit Existing Depot Signaling System Renovation[J]. Urban Mass Transit, 2024, 27(4): 233-237.
[17]戴翌清.城市轨道交通信号系统更新改造需求分析[J].城市轨道交通研究,2022,25(11):14-17,22.
Dai Yiqing. Demand Analysis of Urban Rail Transit Signal System Renovation[J]. Urban Mass Transit, 2022, 25(11): 14-17, 22.
[18]张金,孙延焕.城市轨道交通信号系统分段开通调试[J].现代城市轨道交通,2014(3):85-88.
Zhang Jin, Sun Yanhuan. Commissioning by Segmented Opening for Signaling System on Transit[J]. Modern Urban Transit, 2014(3): 85-88.
[19]李冬,李晓梅.武汉轨道交通1号线延伸线信号系统倒接方案分析[J].城市轨道交通研究,2014,17(S1):55-57,61.
Li Dong, Li Xiaomei. Analysis of Signal System Reverse Connection Scheme of Wuhan Rail Transit Line 1 Extension Line[J]. Urban Mass Transit, 2014, 17(S1): 55-57, 61.
[20]韩奕玮.上海轨道交通2号线信号系统改造的难点及应对策略[J].城市轨道交通研究,2021,24(11):100-103.
Han Yiwei. Difficulties and Coping Strategy of Signaling System Transformation of Shanghai Rail Transit Line 2[J]. Urban Mass Transit, 2021, 24(11): 100-103.
[21]张杰.铁路车站信号改造工程道岔过渡施工技术[J].铁路技术创新,2022(2):47-51.
Zhang Jie. Turnout Transition Construction Technology in Railway Station Signaling Upgrade Project[J]. Railway Technical Innovation, 2022(2): 47-51.
|