时间继电器对提速道岔控制电路的影响分析

丁古春,孙雪萍   

  1. 中国铁路兰州局集团有限公司嘉峪关电务段,甘肃嘉峪关 735100
  • 收稿日期:2020-07-31 修回日期:2020-09-25 出版日期:2021-08-25 发布日期:2021-08-25

Analysis of Influence of Time Relay on Control Circuit of Speed-raising Switch

Ding Guchun,  Sun Xueping   

  1. Jiayuguan Signaling & Communication Depot, China Railway Lanzhou Group Co., Ltd., Jiayuguan    735100, China
  • Received:2020-07-31 Revised:2020-09-25 Online:2021-08-25 Published:2021-08-25

摘要: 兰州至新疆普速铁路线上使用的双机牵引提速道岔多次出现道岔转换过程中转换不到位现象,经更换一启动继电器(1DQJ)后转换正常。经对提速道岔组合更换后的故障继电器进行测试分析,提出问题的解决方案,经现场实施,取得良好效果。

关键词: 1DQJ, 接点溶蚀, 停机电路, 解决方案

Abstract: The double-machine traction speed-raising switch used on Lanzhou-Xinjiang conventional speed line is not in place in the switch conversion process for many times, and the switch is normal after replacing the relay (1DQJ). Through the test and analysis of the combination fault replacement relay of the speed-raising switch, this paper puts forward a solution to the problem, which has been implemented in the field and achieved good results.

Key words: 1DQJ, contact corrosion, stop circuit, solution