欢迎访问铁路通信信号工程技术,今天是 English

铁路通信信号工程技术 ›› 2021, Vol. 18 ›› Issue (11): 1-8.DOI: 10.3969/j.issn.1673-4440.2021.11.001

• •    下一篇

高铁调度车务一体化仿真实训平台设计应用

刘 俊1,丁治敏2,乌 峥3,张 涛4,张洪杰3   

  1. 1.中国国家铁路集团有限公司,北京 100848;
    2.北京全路通信信号研究设计院集团有限公司,北京 100070;  
    3.中国铁路北京局集团有限公司,北京 100860;
    4.中国铁道科学研究院集团有限公司,北京 100081
  • 收稿日期:2021-09-13 修回日期:2021-09-26 出版日期:2021-11-25 发布日期:2021-11-25
  • 基金资助:
    中国国家铁路集团有限公司科技研究开发计划重点课题项目(N2019G020)

Design and Application of High-speed Railway Simulation Training Platform of Operation-dispatching Integration

Liu Jun1,  Ding Zhimin2,  Wu Zheng3,  Zhang Tao4,  Zhang Hongjie3   

  1. 1. China State Railway Group Co., Ltd., Beijing    100848, China;
    2. CRSC Research & Design Institute Group Co., Ltd., Beijing    100070, China;
    3. China Railway Beijing Group Co., Ltd., Beijing    100860, China;
    4. China Academy of Railway Sciences Co., Ltd., Beijing    100081, China

  • Received:2021-09-13 Revised:2021-09-26 Online:2021-11-25 Published:2021-11-25

摘要: 考虑到现有高铁实训系统存在的诸多问题,如与现场环境脱节、实训手段单一、数据不能共享、调度与车务人员实训与演练割裂、考评标准不统一等,设计一套调度、车务一体化仿真实训平台。该平台采用分层设计的思路,分为表示层、数据支撑层、基础设备层、业务应用层。重点阐述业务应用层的设计思路和方法,使得一体化仿真实训平台支撑调度、车务单独或联合演练的各种场景,贴合现场实际,真正达到以实物式、实景式、实作式的考核目的。

关键词: 高速铁路, 仿真培训, 调度车务一体化, 多场景演练

Abstract: Based on the problems of current practical training system for high-speed railway, such as disconnection of environment between training and site, lacking of various training methods and ways of sharing training data, incompatibility between training and practice among dispatching and train operation personnel, and disunification of teaching assessment standards, this paper designs a simulation training platform of operation-dispatching integration. The platform is made up of four layers: presentation layer, data supporting layer, fundamental equipment layer and business application layer. Furthermore, the design idea and method of business application layer are mainly discussed in the paper, making the integrated simulation training platform capable of realizing multiple scenarios, such as joint-practice or practice alone, and achieving real result of evaluation based on the goals of real-object, live-action and real-action.

Key words: high-speed railway, simulation training system, integrated operation-dispatching integration, multi-scene training

中图分类号: