[1]蔡京军,丰磊,马兰,等.北京大兴国际机场线基于LTE-M系统的业务综合承载方案[J].城市轨道交通研究,2019,22(12):176-181.
Cai Jingjun, Feng Lei, Ma Lan, et al. Business Comprehensive Bearing Scheme for Beijing Daxing International Airport Express Based on LTE-M System[J]. Urban Mass Transit, 2019, 22(12): 176-181.
[2]戴克平,张艳兵,朱力,等.基于LTE的城市轨道交通车地通信综合承载系统[J].都市快轨交通,2016,29(1):69-74.
Dai Keping, Zhang Yanbing, Zhu Li, et al. An Integrated LTE-Based Urban Rail Train Ground Communication System[J]. Urban Rapid Rail Transit, 2016, 29(1): 69-74.
[3]周建美.LTE-M系统频率干扰研究[J].铁道通信信号,2018,54(12):86-90.
Zhou Jianmei. Study on Frequency Interference of LTE-M System[J]. Railway Signalling & Communication, 2018, 54(12): 86-90.
[4]戴克平.LTE-M车-地无线通信系统抗干扰研究[J].铁道通信信号,2017,53(2):47-50.
Dai Keping. Research on Anti-Interference Solution for LTE-M Train-Ground Wireless Communication in Urban Rail Transit[J]. Railway Signalling & Communication, 2017, 53(2): 47-50.
[5]蔡秉江.全自动运行场景下LTE-M系统业务分析及频率规划[J].铁道勘测与设计,2020(4):60-63.
[6]王鹏.西安机场线LTE-M系统干扰保护及网络优化[J].城市轨道交通研究,2021,24(5):47-50.
Wang Peng. Interference Protection and Network Optimization of LTE-M System on Xi’an Airport Intercity Railway[J]. Urban Mass Transit, 2021, 24(5): 47-50.
[7]张世铭.LTE-M系统在同站台平行换乘车站覆盖方案的应用研究[J].铁路通信信号工程技术,2019,16(12):51-55.
Zhang Shiming. Research on Application of LTE-M System Coverage Scheme of Parallel Transfer on the Same Platform[J]. Railway Signalling & Communication Engineering, 2019, 16(12): 51-55.
[8]蔡秉江.全自动运行场景下LTE-M系统业务分析及频率规划[J].铁道勘测与设计,2020(4):60-63.
Cai Bingjiang.Function Analysis and Frequency Allocation of LTE-M System in Fully Automatic Operation Scenario[J].Railway Survey and Design, 2020(4):60-63.
[9]王鹏.西安机场线LTE-M系统干扰保护及网络优化[J].城市轨道交通研究,2021,24(5):47-50.
Wang Peng.Interference Protection and Network Optimization of LTE-M System on Xi’an Airport Intercity Railway[J].Urban Mass Transit, 2021, 24(5):47-50.
[10]张世铭.LTE-M系统在同站台平行换乘车站覆盖方案的应用研究[J].铁路通信信号工程技术,2019,16(12):51-55.
Zhang Shiming.Research on Application of LTE-M System Coverage Scheme of Parallel Transfer on the Same Platform[J].Railway Signalling & Communication Engineering, 2019, 16(12):51-55.
[11]潘皓,丰磊.北京轨道交通换乘站LTE-M系统干扰分析[J].铁路通信信号工程技术,2022,19(11):70-75.
Pan Hao,Feng Lei.Analysis of LTE-M System Interference of Beijing Rail Transit Transfer Stations[J].Railway Signalling & Communication Engineering, 2022, 19(11):70-75.
[12]白雪.轨道交通LTE系统等保接入方案及实现[J].铁路通信信号工程技术,2024,21(1):92-97.
Bai Xue.Grading Protection Access Scheme and Implementation of Rail Transit LTE System[J].Railway Signalling & Communication Engineering, 2024, 21(1):92-97.
[13]陈尔超,王喜军,杨立新,等.轨道交通改造工程漏泄电缆敷设方案[J].铁路通信信号工程技术,2023,20(2):89-94.
Chen Erchao,Wang Xijun,Yang Lixin,et al.Research on Leakage Cable Laying Scheme in Rail Transit Modification Project[J].Railway Signalling & Communication Engineering, 2023, 20(2):89-94.
[14]林静.温州轨道交通LTE系统共用区域覆盖解决方案[J].铁路通信信号工程技术,2023,20(3):63-67.
Lin Jing.Common Area Coverage Solution of LTE System for Wenzhou Rail Transit[J].Railway Signalling & Communication Engineering, 2023, 20(3):63-67.
[15]王锐.机车综合无线通信设备功能号注册问题简析[J].铁路通信信号工程技术,2023,20(7):55-58.
Wang Rui.Analysis of Registration of CIR Function Number[J].Railway Signalling & Communication Engineering, 2023, 20(7):55-58.
[16]杨震,邝荣华,蔡景俏,等.基于PRP提升CBTC车地无线通信可靠性方案研究[J].铁路通信信号工程技术,2023,20(9):83-86,100.
Yang Zhen, Kuang Ronghua, Cai Jingqiao, et al.Research on Improving Reliability of CBTC Train-Ground Wireless Communication Based on PRP[J].Railway Signalling & Communication Engineering, 2023, 20(9):83-86,100.
[17]张世铭,张建明,许瑜.成都地铁1号线信号系统车地无线改造工程方案[J].铁路通信信号工程技术,2023,20(11):92-96.
Zhang Shiming,Zhang Jianming,Xu Yu.Vehicle-Ground Wireless Renovation Project of Signaling System for Chengdu Metro Line 1[J].Railway Signalling & Communication Engineering, 2023, 20(11):92-96.
|