欢迎访问铁路通信信号工程技术,今天是 English

铁路通信信号工程技术 ›› 2025, Vol. 22 ›› Issue (3): 92-97.DOI: 10.3969/j.issn.1673-4440.2025.03.014

• • 上一篇    下一篇

沙河滩车辆段列车出段能力测算与分析

周素霞1,2,刘一铄1   

  1. 1.北京建筑大学机电与车辆工程学院,北京 100044;
    2.北京建筑大学城市轨道交通车辆服役性能保障北京市重点实验室,北京 100044
  • 收稿日期:2024-05-19 修回日期:2025-02-28 出版日期:2025-03-25 发布日期:2025-03-25
  • 作者简介:周素霞(1971—),女,教授,博士,主要研究方向:结构的疲劳与断裂、车辆动力学,邮箱:zhousuxia@bucea.edu.cn
  • 基金资助:
    北京市自然科学基金项目(L211007)

Calculation and Analysis of Train Departure Capacity in Shahetan Depot

Zhou Suxia1, 2,  Liu Yishuo1   

  1. 1. School of Mechanical-Electronic and Vehicle Engineering, Beijing University of Civil Engineering and Architecture, Beijing    100044, China;
    2. Beijing Key Laboratory of Performance Guarantee on Urban Rail Transit Vehicles, Beijing University of Civil Engineering and Architecture, Beijing    100044, China
  • Received:2024-05-19 Revised:2025-02-28 Online:2025-03-25 Published:2025-03-25

摘要: 为提升沙河滩车辆段列车出段效率,满足后续增车需求,对列车出段能力进行分析与测算。首先列举出影响列车出段能力的3个关键要素,然后对这3个要素的影响方式进行分析,并测算全自动运行模式下的列车出段效率,最后对进一步提高列车出段能力提出两点建议。一是提升列车在咽喉区内行车速度,出段能力可提升到11.64列/小时,二是对信号系统设备升级,进一步缩短列车唤醒和自检时长。

关键词: 地铁车辆段, 全自动驾驶, 列车休眠与唤醒, 运行效率

Abstract: In order to improve the train departure efficiency of Shahetan Depot and meet the demand for additional trains, this paper conducts analysis and calculation on the train departure capacity. Firstly, it lists three key factors that affect the train departure capacity , and then analyzes how these three factors exert influence. Secondly, it calculates the train departure efficiency under the FAO mode. Finally, it provides two suggestions to further improve the train departure capacity. The first is to increase the train running speed in the throat area, so that the train departure capacity can be increased to 11.64 trains per hour. The second is to upgrade the signaling system equipment, so that the train dormancy and awakening time can be further shortened.

Key words: metro depot, fully automatic operation, train dormancy and awakening, operation efficiency

中图分类号: