欢迎访问铁路通信信号工程技术,今天是 English

铁路通信信号工程技术 ›› 2021, Vol. 18 ›› Issue (11): 9-12.DOI: 10.3969/j.issn.1673-4440.2021.11.002

• • 上一篇    下一篇

高铁集中区进站口分界列控区间逻辑检查处理方案

方升炜   

  1. 中国铁路上海局集团有限公司,上海 200071
  • 收稿日期:2021-02-27 修回日期:2021-03-11 出版日期:2021-11-25 发布日期:2021-11-25

High-speed Railway Treatment Scheme of Train Control Sectional Logic Check at Entrance of Centralized Boundary

Fang Shengwei   

  1. China Railway Shanghai Group Co., Ltd., Shanghai    200071, China
  • Received:2021-02-27 Revised:2021-03-11 Online:2021-11-25 Published:2021-11-25

摘要: 重点剖析一例新建CTCS-3模式高铁引入既有CTCS-2模式高铁分界口车站集中区在进站口、进站外方第一闭塞分区发生逻辑检查报警(失去分路)问题原因,提出解决问题的若干技术方案并做比较,为类似问题分析处理和源头管控提供参考。

关键词: 列控中心, 失去分路, 信号许可

Abstract: This paper analyzes the reason for logic check alarm (loss of shunting) occurred at the entrance and the first block area outside the entrance of the station of a new CTCS-3 mode of high-speed railway introduced into the existing CTCS-2 mode of high-speed railway, and puts forward several technical solutions to solve the problem and makes comparison, so as to provide reference for the analysis and treatment of similar problems and source control.

Key words: Train Control Center (TCC), loss of shunting, Signal Authority (SA)