Research on Problem of Two Main Disconnections in Neutral Section

Gao Xinjun,  Wang Yang,  Zhou Yongjian,  Huo Liming   

  1. China Academy of Railway Sciences Co., Ltd., Beijing    100081, China
  • Received:2021-09-26 Revised:2022-04-20 Online:2022-06-20 Published:2022-06-25

过分相两次断主断问题研究

郜新军,汪 洋,周永健,霍黎明   

  1. 中国铁道科学研究院集团有限公司,北京 100081
  • 作者简介:郜新军(1987—),男,助理研究员,硕士,主要研究方向:高速铁路信号系统综合试验及联调联试研究,邮箱:tkygxj@163.com。
  • 基金资助:
    中国铁路总公司科技研究开发重大课题项目(K2018G011)

Abstract: In view of the EMU with CTCS3-300S on-board ATP that has the problem of two disconnections in neutral section  found during integrated commissioning and test (ICT) of signaling system, this paper carries out a multi-angle study in combination with the interpretation of the principle in neutral section, the cause of test problem, and the discussion of industry standards. In the end, the paper identifies the cause of the problem, and considers the method of ICT and the source of design specification.

Key words:  high-speed railway, neutral section, on-board ATP, magnetic steel, ICT

摘要: 针对信号系统联调联试互联互通测试期间发现的装载有CTCS3-300S车载ATP的动车组在过分相时存在两次断主断问题,结合过分相原理解读、试验问题原因查找、行业规范探讨等方面进行多角度研究。最终锁定问题原因,并对联调联试方法以及设计规范源头问题进行思考。

关键词: 高速铁路, 过分相, 车载ATP, 磁钢, 联调联试