Lei Liming, Zhu Hengguo, Ren Ying, Yang Xiaorong. Promoting Capacity for Trains Entering or Exiting the Depot of Changsha Metro Line 2[J]. Railway Signalling & Communication Engineering, 2021, 18(10): 81-85.
[1]中华人民共和国住房和城乡建设部.GB 50157-2013 地铁设计规范[S].北京:中国建筑工业出版社,2014.
[2]陈东.地铁车辆段发车能力研究[J].智能城市,2021,7(1):3-5.
[3]西小鸣.地铁场段咽喉区股道布置研究[J].现代城市轨道交通,2020(9):94-98.
Xi Xiaoming. Study on Track Layout at Throat Area in Metro Depot and Yard[J]. Modern Urban Transit, 2020(9): 94-98.
[4]丁建中,牛振宇.基于通信的列车控制系统对车辆基地出入段能力的影响研究[J].城市轨道交通研究,2011,14(5):31-35.
Ding Jianzhong, Niu Zhenyu. Research of the Entry-exit Capacity of Vehicle Depot[J]. Urban Mass Transit, 2011, 14(5): 31-35.
[5]张雄,李剑虹.广州地铁三号线洛溪车辆段出入段线设计方案及能力分析[J].铁道工程学报,2007,24(4):73-76.
Zhang Xiong, Li Jianhong. Design Proposal and Capacity Analysis of Entrance/Exit Line from Luoxi Depot of Guangzhou Metro Line 3[J]. Journal of Railway Engineering Society, 2007, 24(4): 73-76.
[6]袁雪源.广州地铁一号线信号系统改造工程风险分析[J].铁路通信信号工程技术,2019,16(4):58-61.
Yuan Xueyuan. Risk Analysis of Signal System Renovation Project of Guangzhou Metro Line 1[J]. Railway Signalling & Communication Engineering, 2019, 16(4): 58-61.
[7]曹峰.基于CBTC系统的轨旁设备布置原则研究[D].北京:北京交通大学,2013.
[8]朱莉.城市轨道交通信号系统改造方案研究[J].城市轨道交通研究,2021,24(4):118-121.
Zhu Li. Retrofit Solution Research of Urban Rail Transit Signaling System[J]. Urban Mass Transit, 2021, 24(4): 118-121.
[9]吴兆薇.长沙地铁2号线运营初期客流特征分析[J].交通科技与经济,2020,22(2):11-15.
Wu Zhaowei. Analysis of Passenger Flow Characteristics in Early Operation of Changsha Subway Line 2[J]. Technology & Economy in Areas of Communications, 2020, 22(2): 11-15.