[1] |
Ning Zongxia.
Research and Application Analysis of ZD(J)9 Switch Machine Waterproof
[J]. Railway Signalling & Communication Engineering, 2021, 18(11): 75-79.
|
[2] |
Sun Xiaoyong, Xie Bocai, Yang Shuo.
Research on Turnout Switching Intelligent Diagnosis System Based on PHM
[J]. Railway Signalling & Communication Engineering, 2021, 18(10): 1-5.
|
[3] |
Wang Yongqing.
Technical Transformation Measures to Reduce Failure Rates of Internal Contacts of Switch Machine
[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 73-76.
|
[4] |
Xu Guangshun.
Discussion on Quality Control Methods of ZYJ7 Electro-hydraulic Switch Machines
[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 107-111.
|
[5] |
Xu Bin.
Application of Turnout Test Simulation Conditions in Commissioning Construction of Signaling Engineering
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 6-10.
|
[6] |
Ning Yongmei.
Discussion on Technical Scheme of Balise Group of Continuous Large Number Turnout
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 15-18.
|
[7] |
Ding Guchun, Sun Xueping.
Analysis of Influence of Time Relay on Control Circuit of Speed-raising Switch
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 65-68.
|
[8] |
Wu Haiping.
Dealing with Mixed Circuit Fault of ZD6 Turnout with Current Method
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 69-74.
|
[9] |
Xie Bocai, Gong Dianjun.
Overview of Turnout Fault Diagnosis and Prognostic Based on Machine Learning
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 93-99.
|
[10] |
Wang Jianqiang, Lu Jianfeng, Chen Zhihui, Yang Jizhong.
Discussion on Conversion Scheme of Movable Rack in Rack Rail Turnout Section
[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 22-24,53.
|
[11] |
Yang Liubing, Liu Jun, Chen Liang, Chen Yanxia.
Detection Rod Gap Jamming Fault at Second Traction Point of S700K Switch Machine for Urban Rail Transit
[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 67-71,85.
|
[12] |
Teng Donghua.
Discussion on Using ATS Information to Judge Turnout Faults
[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 94-96,112.
|
[13] |
Zhu Lun.
Signaling Transition Scheme of Switch Transformation Caused by Rail Structure Optimization in Yantai Station
[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 107-112.
|
[14] |
Teng Donghua, Tang Chunyan, Wu Chuan, Wang Tianhao.
Application of Dual Prevention Mechanism in Switch Equipment Maintenance
[J]. Railway Signalling & Communication Engineering, 2021, 18(6): 82-87.
|
[15] |
Wang Hongliang, Kui Kaiteng, Wang Lijun, Li Jinhai, Xie Wenbin.
Calculation of Cable Distance for Single-phase AC Switch Mechanism
[J]. Railway Signalling & Communication Engineering, 2021, 18(6): 96-99.
|