[1] Lai Y C, Wang S H. Development of Analytical Capacity Models for Conventional Railways with Advanced Signaling Systems[J]. Journal of Transportation Engineering, 2012, 138(7): 961-974.
[2]张妍莹,祝陶美,王涛.CBTC系统列车运行间隔控制仿真研究[J].铁道通信信号,2018,54(10):57-61.
Zhang Yanying, Zhu Taomei, Wang Tao. Research on Simulation of Train Headway in CBTC System[J]. Railway Signalling & Communication, 2018, 54(10): 57-61.
[3]陈荣武,诸昌钤,刘莉.CBTC系统列车追踪间隔计算及优化[J].西南交通大学学报,2011,46(4):579-585.
Chen Rongwu, Zhu Changqian, Liu Li. Calculation and Optimization of Train Headway in CBTC System[J]. Journal of Southwest Jiaotong University, 2011, 46(4): 579-585.
[4]葛兰新.计轴器故障影响CBTC列车运行问题解决方案[J].铁道通信信号,2013,49(1):28-30.
Ge Lanxin. Effect Analysis of Axle Counter Failure to CBTC Train Operation[J]. Railway Signalling & Communication, 2013, 49(1): 28-30.
[5]丁树奎,王颖,王伟,等.互联互通CBTC系统中计轴故障占用判断方案研究[J].铁路计算机应用,2017,26(8):55-58.
Ding Shukui, Wang Ying, Wang Wei, et al. ARB Judgment Solution in Interconnection CBTC System[J]. Railway Computer Application, 2017, 26(8): 55-58.
[6]吴炳昊,董俊超,高国梁.CBTC系统中计轴区段ARB状态判定方法[J].铁道通信信号,2014,50(5):10-12.
Wu Binghao, Dong Junchao, Gao Guoliang. ARB Status Determination Methods of CBTC System in Axle Counting Section[J]. Railway Signalling & Communication, 2014, 50(5): 10-12.
[7]蔡荣富,刘小龙,王振强.CBTC系统中一种判断计轴区段故障占用的方法[J].铁道通信信号,2018,54(10):70-72.
Cai Rongfu, Liu Xiaolong, Wang Zhenqiang. Method of Determining Fault Occupancy of Axle Counter Section in CBTC System[J]. Railway Signalling & Communication, 2018, 54(10): 70-72.
[8]李伟,唐涛,王呈,等.无线通信延迟对城市轨道交通CBTC列车追踪间隔影响研究[J].铁道学报,2017,39(7):73-78.
Li Wei, Tang Tao, Wang Cheng, et al. Research on Influence of Wireless Communication Delay on CBTC Train Headway of Urban Rail Transit System[J]. Journal of the China Railway Society, 2017, 39(7): 73-78.
|