欢迎访问铁路通信信号工程技术,今天是 English

铁路通信信号工程技术 ›› 2021, Vol. 18 ›› Issue (5): 54-58.DOI: 10.3969/j.issn.1673-4440.2021.05.010

• • 上一篇    下一篇

南通枢纽GSM-R覆盖方案研究

葛伟涛   

  1. 中国铁路设计集团有限公司,天津 300308
  • 收稿日期:2020-11-02 修回日期:2020-12-20 出版日期:2021-05-25 发布日期:2021-08-13

Research on GSM-R Coverage Scheme of Nantong Hub

Ge Weitao   

  1. China Railway Design Corporation, Tianjin 300308, China
  • Received:2020-11-02 Revised:2020-12-20 Online:2021-05-25 Published:2021-08-13

摘要: 南通地区枢纽内铁路包括已经开通的宁启铁路、沪苏通铁路、赵甸联络线、即将建成的盐通高铁和陈桥联络线,为满足枢纽地区各条线路的覆盖需求,需对枢纽地区的GSM-R系统进行统筹设计。对南通枢纽GSM-R覆盖方案进行研究,并提出工程最终实施方案,供其他项目借鉴参考。

关键词: 南通枢纽, 宁启铁路, 沪苏通铁路, 盐通高铁, GSM-R

Abstract: The railway within Nantong regional hub includes the already operated Ningqi railway, Shanghai-Suzhou-Nantong railway, Zhaodian connecting line, the soon-to-be built Yantong high-speed railway and Chenqiao connecting line. In order to meet the coverage requirements of each line in the hub region, the GSM-R system in the hub region should be designed as a whole. The GSM-R coverage scheme of Nantong hub is studied in this paper, and the final implementation scheme of the project is put forward, which can be used for reference by other projects.

Key words: Nantong hub, Ningqi railway, Shanghai-Suzhou-Nantong railway, Yantong high-speed railway, GSM-R

中图分类号: