Railway Signalling & Communication Engineering ›› 2022, Vol. 19 ›› Issue (4): 81-84.DOI: 10.3969/j.issn.1673-4440.2022.04.017
Previous Articles Next Articles
Shi Lei
Received:
Revised:
Online:
Published:
石 磊
作者简介:
基金资助:
Abstract: Jiaxing Railway Station and Jiaxing East Railway Station adopt special shunting liaison circuits between stations. This paper describes in detail the optimizing schemes, analyzes their advantages and disadvantages, and proposes an improved feasible scheme based on the analysis of the existing problems of such shunting circuits. The proposed design scheme can meet the requirements of project implementation, and provide a reference for similar designs.
Key words: shunting, liaison circuits between stations, route
摘要: 嘉兴站与嘉兴东站采用特殊的调车站联方式,在对既有调车站联存在问题分析的基础上,详细介绍调车站联的优化方案,并进行优缺点分析,最终提出具备工程可实施性的调车站联优化方案,该方案可以为类似的工程设计提供参考。
关键词: 调车, 站联, 进路
CLC Number:
U284
Shi Lei. Optimizing Schemes for Special Shunting Liaison Circuits between Stations[J]. Railway Signalling & Communication Engineering, 2022, 19(4): 81-84.
石 磊. 一种特殊调车站联优化方案[J]. 铁路通信信号工程技术, 2022, 19(4): 81-84.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://rsce.crscd.com.cn/EN/10.3969/j.issn.1673-4440.2022.04.017
https://rsce.crscd.com.cn/EN/Y2022/V19/I4/81