[1] |
Kang Aiwei, Zhou Miao, Li Jinhai, Zhu Xuanyi, Song Weiwei.
Design and Realization of Buried Electro-hydraulic Switch Machine Specially Designed for Trams
[J]. Railway Signalling & Communication Engineering, 2022, 19(9): 90-94.
|
[2] |
Mei Jigang.
Analysis and Improvement of Cracking Fault of Shift Contactor
[J]. Railway Signalling & Communication Engineering, 2022, 19(8): 106-110.
|
[3] |
Tan Rensheng, Yang Zhi, She Lujun.
Design Idea of Solving Problem of Water Accumulation in Foundation Pit of Rail Transit Switch Machine
[J]. Railway Signalling & Communication Engineering, 2022, 19(6): 117-120.
|
[4] |
Kui Kaiteng, Wang Hongliang, Li Jinhai, Cheng Yanfei, Xie Wenbin.
Application Analysis of Electro-hydraulic Actuator in Switch Machine
[J]. Railway Signalling & Communication Engineering, 2022, 19(12): 110-113.
|
[5] |
Li Chaojin, Ren Xiguo.
Design of Drive Module of Nodeless DC Switch Machine
[J]. Railway Signalling & Communication Engineering, 2022, 19(10): 19-23.
|
[6] |
Wang Yongqing.
Technical Transformation Measures to Reduce Failure Rates of Internal Contacts of Switch Machine
[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 73-76.
|
[7] |
Xu Guangshun.
Discussion on Quality Control Methods of ZYJ7 Electro-hydraulic Switch Machines
[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 107-111.
|
[8] |
Li Weifeng.
Analysis and Calculation of Control Distance of Centralized Power Supply ZD6-E/J/J Switch Machine
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 11-14,23.
|
[9] |
Ding Guchun, Sun Xueping.
Analysis of Influence of Time Relay on Control Circuit of Speed-raising Switch
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 65-68.
|
[10] |
Wu Zhiming, Huang Ju, Zhou Shengli.
Service Stability Analysis of Point Machine Contact Group
[J]. Railway Signalling & Communication Engineering, 2021, 18(8): 80-84.
|
[11] |
Yang Liubing, Liu Jun, Chen Liang, Chen Yanxia.
Detection Rod Gap Jamming Fault at Second Traction Point of S700K Switch Machine for Urban Rail Transit
[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 67-71,85.
|
[12] |
Wang Hongliang, Kui Kaiteng, Wang Lijun, Li Jinhai, Xie Wenbin.
Calculation of Cable Distance for Single-phase AC Switch Mechanism
[J]. Railway Signalling & Communication Engineering, 2021, 18(6): 96-99.
|
[13] |
Baocai Rangtai, Mo Chongming, Zhai Wenge, Ding Zhaorong.
Research on Demand and Method of Comprehensive Monitoring of Switch Machine
[J]. Railway Signalling & Communication Engineering, 2021, 18(4): 5-10.
|
[14] |
Tie Guanglei.
Analysis of Drawing Back of Moving Contacts of Switch Machine Caused by Circuit Errors
[J]. Railway Signalling & Communication Engineering, 2021, 18(3): 109-112.
|
[15] |
Ning Zongxia.
Research and Application Analysis of ZD(J)9 Switch Machine Waterproof
[J]. Railway Signalling & Communication Engineering, 2021, 18(11): 75-79.
|