Radio Block Center System for Shuozhou-Huanghua Heavy Haul Railway
He Zhanyuan1, Zhang Yanhui2, 3
1. Shuohuang Railway Development Co., Ltd., Suning 062350, China;
2. CRSC Research & Design Institute Group Co., Ltd., Beijing 100070, China;
3. Beijing Engineering Technology Research Center of Operation Control Systems for High Speed Railways, Beijing 100070, China
He Zhanyuan, Zhang Yanhui. Radio Block Center System for Shuozhou-Huanghua Heavy Haul Railway[J]. Railway Signalling & Communication Engineering, 2022, 19(4): 6-12,18.
[1]交控科技股份有限公司.朔黄重载铁路移动闭塞扩大试验与工程化应用总体技术方案[Z].北京:交控科技股份有限公司,2019.
[2]杨霓霏,王浩,刘晓斌,等.重载铁路移动闭塞系统架构研究[J].铁路计算机应用,2021,30(1):67-71.
Yang Nifei, Wang Hao, Liu Xiaobin, et al. Research on Framework of Moving Block System for Heavy Haul Railway[J]. Railway Computer Application, 2021, 30(1): 67-71.
[3]何永发,刘金瑞.重载铁路大型车站移动闭塞系统应用研究[J].铁道通信信号,2018(3):21-24.
He Yongfa, Liu Jinrui. Application Research on Moving Block System for Large Station in Heavy-Haul Railway[J]. Railway Signalling & Communication, 2018(3): 21-24.
[4]赵海军.移动闭塞方式下的重载铁路运输能力研究[J].能源科技,2020,18(8):80-84.
Zhao Haijun. Research on Transport Capacity of Heavy Haul Railways in Moving Block Mode[J].Energy Science and Technology, 2020, 18(8): 80-84.
[5]邹枫.重载铁路移动闭塞运输组织方案研究[J].高速铁路技术,2020,11(6):95-99.
Zou Feng. Study on Transportation Organization Scheme of Moving Block in Heavy-Haul Railway[J]. High Speed Railway Technology, 2020, 11(6): 95-99.
[6]张国强.朔黄重载铁路移动闭塞信号显示研究[J].铁路通信信号工程技术,2020,17(2):45-50.
Zhang Guoqiang. Research on Signal Aspect and Indication of Moving Block of Shuo-Huang Heavy Haul Railway[J]. Railway Signalling & Communication Engineering, 2020, 17(2): 45-50.
[7]何占元,何永发,贾利生.重载铁路移动闭塞降级系统方案研究[J].铁道通信信号,2018,54(4):8-12.
He Zhanyuan, He Yongfa, Jia Lisheng. Study on Degraded Solution of Moving Block in Heavy-Haul Railway[J]. Railway Signalling & Communication, 2018, 54(4): 8-12.
[8]付文刚,刘畅,杨居丰.基于LTE技术重载铁路移动闭塞通信系统研究及应用[J].铁道通信信号,2018,54(5):47-49.
Fu Wengang, Liu Chang, Yang Jufeng. Study and Application of LTE-Based Communication System for Moving Automatic Block in Heavy-Haul Railway[J]. Railway Signalling & Communication, 2018, 54(5): 47-49.