[1]丁昆.成都北编组站综合集成自动化系统[J].中国铁路,2006(8):46-48.
[2]邓庚发,刘克难.CTC3.0系统调车计划管理功能研究[J].铁路通信信号工程技术,2018,15(3):72-74.
Deng Gengfa, Liu Kenan. Research on Shunting Plan Management Function of CTC3.0 System[J]. Railway Signalling & Communication Engineering, 2018, 15(3): 72-74.
[3]沈晓瑜.朔黄铁路机车调度系统设计[J].铁路通信信号工程技术,2021,18(5):28-32.
Shen Xiaoyu. Design of Locomotive Dispatching System for Shuohuang Railway[J]. Railway Signalling & Communication Engineering, 2021, 18(5): 28-32.
[4]刘涛.CTC条件下中间站列调车作业控制的优化方案[J].铁路通信信号工程技术,2012,9(5):3-5.
Liu Tao. Optimization Scheme of Train and Shunting Operation at Intermediate Station under CTC Control[J]. Railway Signalling & Communication Engineering, 2012, 9(5): 3-5.
[5]钱晓凌.我国铁路CTC系统的应用现状[J].铁路通信信号工程技术,2020,17(4):33-35.
Qian Xiaoling.Application Status of Railway CTC System in China[J]. Railway Signalling & Communication Engineering, 2020, 17(4): 33-35.
[6]何鸿云,蒋勇.机务段股道管理自动化系统的开发[J].机车电传动,2005(5):63-66.
He Hongyun, Jiang Yong. Development of Automatic Track Management System for Locomotive Depot[J]. Electric Drive for Locomotives, 2005(5): 63-66.
[7]何鸿云,周美玉.铁路机务段微机联锁系统[J].内燃机车,2000(3):19-22.
He Hongyun, Zhou Meiyu. The Microprocessor Interlock System in Locomotive Depots[J]. Diesel Locomotives, 2000(3): 19-22.
[8]岳建国.机车运用机务段调度指挥计算机管理系统[J].铁道机车车辆,1995,15(2):54-57.
[9]齐金平,吴平,谢荣,等.基于多代理铁路机务生产调度协同平台的构建[J].铁路计算机应用,2008,17(12):21-23.
Qi Jinping, Wu Ping, Xie Rong, et al. Design of Coordination Platform for Locomotive Depot Production Management Based on Multi-Agent System[J]. Railway Computer Application, 2008, 17(12): 21-23.
[10]唐国平,王铁钢.机务运用安全管理信息系统[J].机车电传动,2002(4):43-46.
Tang Guoping, Wang Tiegang.Information System for Locomotive Operation, Safety and Management[J]. Electric Drive for Locomotive, 2002(4): 43-46.