Yang Cheng, Zhu Ming, Tang Qiang. Case Analysis of Liaison Circuit between Lhasa Station and Lhasa Loco Depot in Renovation Design[J]. Railway Signalling & Communication Engineering, 2021, 18(12): 18-21.
[1]赵健.关于“与机务段联系调车信号机设置”的探讨[J].铁道标准设计,2008,52(11):101.
[2]齐厚芬.机务段与运转场场间联系电路特殊设计[J].硅谷,2015,8(3):214.
[3]高明智.既有信号设备改造设计方案探讨[J].铁路通信信号工程技术,2019,16(5):69-72.
Gao Mingzhi. Discussion on Transformation Design Scheme of Existing Signal Equipment[J].Railway Signalling & Communication Engineering, 2019, 16(5): 69-72.
[4]文雪英.站改自动、半自动闭塞过渡电路处理方案研究[J].铁路通信信号工程技术,2020,17(1):101-105.
Wen Xueying. Research on Design of Transition Circuit from Semi-automatic to Automatic Block[J]. Railway Signalling & Communication Engineering, 2020, 17(1): 101-105.
[5]周远.继电器逻辑检查设备实现远程控制的改造方案[J].铁路通信信号工程技术,2021,18(6):92-95.
Zhou Yuan. Transformation Plan for Remote Control of Relay Logic Check Equipment[J].Railway Signalling & Communication Engineering, 2021, 18(6): 92-95.
[6]中华人民共和国国家铁路局.TB 10007—2017 铁路信号设计规范[S].北京:中国铁道出版社,2017.