Welcome to Railway Signalling & Communication Engineering, Today is 中文

Railway Signalling & Communication Engineering ›› 2021, Vol. 18 ›› Issue (9): 60-64.DOI: 10.3969/j.issn.1673-4440.2021.09.012

Previous Articles     Next Articles

Application of Integrated Monitoring Test in Dashihedong Laboratory

Yang Yanyan,  Liu Qing   

  1. Beijing Metro Consultancy Co., Ltd., Beijing    100068, China
  • Received:2020-05-18 Revised:2021-05-22 Online:2021-09-24 Published:2021-10-13

大石河东实验室综合监控测试应用研究

杨艳艳,刘 晴   

  1. 北京城市轨道交通咨询有限公司,北京 100068
  • 基金资助:
    北京市自然基金“轨道交通联合”项目(L181005)

Abstract: Since the opening of the Yanfang line's autonomous fully automatic operation demonstration project, the subsequent new lines in Beijing have adopted fully automatic operation systems. The laboratory integration tests of the Beijing New Fourth Line are all carried out in the Dashihedong Laboratory. Therefore, The test ability of Integrated Supervisory Control System and other FAO core subsystems established is particularly important.This paper first analyzes the environmental resources of the current equipment in the laboratory, and introduces the construction of the minimum test environment ofIntegrated Supervisory Control System , and tests comprehensively the Integrated Supervisory Control System of the new airport line According to the standard of integrated monitoring, and finally explains and summarizes the test problems. In conclusion, the Integrated Supervisory Control System test platform  deployed can meet the actual test requirements, so that the management personnel can effectively assess the comprehensive ability of the laboratory.

Key words: test environment deployment, typical test case, test problem analysis, test prospect

摘要: 自燕房线自主化全自动运行示范工程开通后,北京后续新线均采用全自动运行制式,北京新四线的室内集成测试均在大石河东实验室进行,因此建立综合监控等FAO核心子系统的测试能力尤为重要。首先分析实验室当前设备的环境资源,然后介绍综合监控最小测试环境的搭建,并对新机场线综合监控系统进行规范标准的验证测试,最后对测试问题进行说明与总结。综上,所部署的综合监控系统测试平台能够满足实际测试需求,使管理人员能够有效地对实验室的综合能力进行评定考核。

关键词: 测试环境部署, 典型测试案例, 测试问题分析, 测试展望

CLC Number: