Cable Routing Schemes of Urban Rail Transit Signaling & Communication Equipment Room
Lu Haiting1, Zhang Yixin2, Zhang Ning3
1.Nanjing Communications Institute of Technology, Nanjing 211188, China;
2.Beijing Urban Construction Design & Development Group Co., Ltd., Beijing 100037, China;
3.ITS Rail Transit Research Institute, Southeast University, Nanjing 210018, China
[1]李伟章,杨海江.城市轨道交通通信[M].2版.北京:中国铁道出版社,2013.
[2]戴新华.机房布线形式的思考[J].中国金融电脑,2010(12):61-62.
Dai Xinhua. The Thinking About the Wiring Form of Computer Room [J]. Financial Computer of China, 2010(12): 61-62.
[3]公吉鹏.地铁信号设备室内电缆敷设方式分析[J].城市轨道交通研究,2015,18(4):128-129.
Gong Jipeng. Analysis of the Laying Method of Indoor Cable for Metro Signal Equipment Room[J].Urban Mass Transit, 2015, 18(4): 128-129.
[4]王成龙.城市轨道交通信号设备室线缆走线方式对比与分析[J].中国设备工程,2019(13):63-64.
[5]徐华.城市轨道交通线网中心数据机房的模块化建设[J].城市轨道交通研究,2018,21(S2):58-60.
Xu Hua. Modular Building of Data Room in Urban Rail Transit COCC[J]. Urban Mass Transit, 2018, 21(S2): 58-60.
[6]朱荣跃,沈春辉.数据中心上下走线方式优劣分析[J].智能建筑与城市信息,2013(2):43-44.
[7]周晨.轨道交通通信机房建设的分析与探讨[J].隧道与轨道交通,2017(3):43-47.
Zhou Chen. Exploration on Rail Transit Communication Equipment Room Construction[J].Tunnels and Rail Transit, 2017(3): 43-47.
[8]林蔚,杨连营,刘辉舟,等.网络桥架上走线在电力信息通信机房布线中的应用[J].低碳世界,2016(18):30-31.