[1]于海波,杨秀杰.铁道线路养修工电配合[M].北京:中国铁道出版社,2015.
[2]国家铁路局.铁路信号设计规范:TB 10007-2017[S].北京:中国铁道出版社,2017.
[3]陈磊.铁路道岔转辙机安装装置故障分析[J]. 铁路通信信号工程技术,2022,19(2):94-99.
Chen Lei. Fault Analysis on Installation Device of Switch Machine[J]. Railway Signalling & Communication Engineering, 2022, 19(2): 94-99.
[4]余冠华,卫旭初.张吉怀高铁智能道岔融雪系统方案探讨[J].铁路通信信号工程技术, 2022,19(2):15-17,34.
Yu Guanhua, Wei Xuchu. Discussion on Scheme of Intelligent Point Heating System for Zhangjiajie-Jishou-Huaihua High Speed Railway[J]. Railway Signalling & Communication Engineering, 2022, 19(2): 15-17, 34.
[5]高亮,刘衍峰,田新宇.铁路跨区间无缝线路关键技术的试验研究[J].土木工程学报, 2005,38(11):128-131,137.
Gao Liang, Liu Yanfeng, Tian Xinyu.An Experimental Study on Key Techniques of Trans-Section Cwr[J]. China Civil Engineering Journal, 2005, 38(11):128-131, 137.
[6]梁作礼.加强工电联合整治减少道岔设备故障[J].广西铁道,2020(2):11-13.
[7]宁咏梅,闫宏伟.铁路道岔融雪装置工程设计标准优化研究[J].铁路通信信号工程技术,2023,20(1):7-13.
Ning Yongmei, Yan Hongwei. Research on Optimization of Engineering Design Standards of Snow Melting Devices for Railway Turnouts[J]. Railway Signalling & Communication Engineering, 2023, 20(1): 7-13.
[8]于秦龙.上海地铁智能运维平台的道岔设备管理[J].铁路通信信号工程技术,2023,20(3):57-62.
Yu Qinlong. Turnout Equipment Management Based on Intelligent Operation and Maintenance Platform of Shanghai Metro[J]. Railway Signalling & Communication Engineering, 2023, 20(3): 57-62.
[9]刘振华,王华.基于双滑块机构的GW-SH型道岔外锁闭装置研究[J].铁路通信信号工程技术,2023,20(4):1-4.
Liu Zhenhua, Wang Hua. Research on GW-SH Turnout External Locking Device Based on Double-Slider Mechanism[J]. Railway Signalling & Communication Engineering, 2023, 20(4): 1-4.
[10]王勇,赵泽.电缆分布电容对交流道岔动作电路的影响[J].铁路通信信号工程技术,2023,20(4):5-10.
Wang Yong, Zhao Ze. Influence of Distributed Capacitance of Cables on AC Switch Transition Circuits[J]. Railway Signalling & Communication Engineering, 2023, 20(4): 5-10.
[11]许辉.装备技术标准与工程建设标准起草规则差异分析[J].铁路通信信号工程技术,2023,20(4):82-89.
Xu Hui. Analysis of Differences between Drafting Rules of Equipment Technical Standards and Engineering Construction Standards[J]. Railway Signalling & Communication Engineering, 2023, 20(4): 82-89.
[12]刘振华.铁路道岔转换阻力分析与监测技术研究[J].铁路通信信号工程技术,2023,20(5):6-9,15.
Liu Zhenhua. Study on Monitoring Technology for Switching Resistance of Railway Turnout[J]. Railway Signalling & Communication Engineering, 2023, 20(5): 6-9, 15.
[13]谢兰英,许海祥.铁路线路属性对信号系统的影响及解决方案[J].铁路通信信号工程技术,2023,20(9):19-22.
Xie Lanying, Xu Haixiang. Influence of Railway Line Attributes on Signaling System and Solutions[J]. Railway Signalling & Communication Engineering, 2023, 20(9): 19-22.
[14]黄晨涛.一种转辙机运行参数综合监测系统[J].铁路通信信号工程技术,2023,20(12):37-42.
Huang Chentao. Comprehensive Monitoring System for Operating Parameters of Switch Machines[J]. Railway Signalling & Communication Engineering, 2023, 20(12): 37-42.
[15]张辉.适用于四线制双机牵引控制电路的ZD9直流电动转辙机[J].铁路通信信号工程技术,2023,20(12):31-36,46.
Zhang Hui. DZ9 DC Electric Switch Machines Suitable for Four-Wire Double-Machine Driving Control Circuit[J]. Railway Signalling & Communication Engineering, 2023, 20(12): 31-36, 46.
[16]刘斌,焦凤霞.FAO信号系统测试方案的探讨与研究[J].铁路通信信号工程技术,2024,21(7):97-103.
Liu Bin, Jiao Fengxia. Discussion and Research on Test Scheme of Signaling System of Fully Automatic Operation System[J]. Railway Signalling & Communication Engineering, 2024, 21(7): 97-103.
[17]胡婕,徐锦材,郭予广.ZD-6型电动转辙机“接点反弹” 的故障分析及预防[J].铁路通信信号工程技术,2023,20(11):106-111.
Hu Jie, Xu Jincai, Guo Yuguang. Fault Analysis and Prevention of “Contact Rebound” of ZD-6 Electric Switch Machine[J]. Railway Signalling & Communication Engineering, 2023, 20(11): 106-111.
[18]邓伟龙.高速铁路引入枢纽信号系统优化设计[J].铁路通信信号工程技术,2024,21(1):16-20,35.
Deng Weilong. Optimization Design of Signaling System for Introducing High-Speed Railway Lines into Hubs[J]. Railway Signalling & Communication Engineering, 2024, 21(1): 16-20, 35.
|