1. CRSC Research & Design Institute Group Co., Ltd., Beijing 100070, China;
2. Beijing Engineering Technology Research Center of Operation Control Systems for High Speed Railways, Beijing 100070, China
[1]中华人民共和国国家铁路局.应答器传输系统技术条件:TB/T 3485—2017[S].北京:中国铁道出版社,2017.
[2]徐兴福.ADS2008射频电路设计与仿真实例[M].2版.北京:电子工业出版社,2013.
[3]王通,叶轲.基于二次拟合的应答器谐振频率测试及优化方法[J].铁路通信信号工程技术,2020,17(8):1-5.
Wang Tong, Ye Ke. Balise Resonance Frequency Test and Optimization Methods Based on Quadratic Fitting[J]. Railway Signalling & Communication Engineering, 2020, 17(8): 1-5.
[4]徐效宁,褚伊郎君,刘磊,等.关于应答器接收天线的安装位置探讨[J].铁路通信信号工程技术,2021,18(2):18-21.
Xu Xiaoning, Chu Yilangjun, Liu Lei, et al. Discussion on Installation Position of Balise Antenna[J]. Railway Signalling & Communication Engineering, 2021, 18(2): 18-21.