Yan Wei. Discussion on Linkage between Train Doors and Platform Screen Doors of CTCS2 + ATO System[J]. Railway Signalling & Communication Engineering, 2022, 19(7): 34-39.
[1]中国铁路总公司.关于印发《城际铁路CTCS2+ATO列控系统暂行总体技术方案》的通知:铁总科技[2013]79号[S].北京:中国铁路总公司,2013.
[2]叶建斌.CTCS2+ATO系统列车门与站台门联动原理和优化方案[J].铁路通信信号工程技术,2019,16(8):5-8.
Ye Jianbin. Linkage Principle and Optimization Scheme of Train Door and Platform Screen Door of CTCS2+ATO System[J]. Railway Signalling & Communication Engineering, 2019, 16(8): 5-8.
[3]刘鸿飞.简析高速铁路ATO系统与城际铁路CTCS2+ATO系统的区别[J].铁路通信信号工程技术,2020,17(2):40-44.
Liu Hongfei. Analysis of Differences Between ATO System for High-speed Railways and CTCS2+ATO System for Intercity Railways[J]. Railway Signalling & Communication Engineering, 2020, 17(2): 40-44.
[4]陈建译.珠三角城际铁路CTCS2+ATO系统与站台门接口研究[J].铁道通信信号,2016,52(12):1-4.
Chen Jianyi. Research on Interface of CTCS2+ATO System and Station Platform in Pearl River Delta Inter-City Railway[J]. Railway Signalling & Communication, 2016, 52(12): 1-4.
[5]宋睿.城际铁路站台门与信号系统接口设计解析[J].铁道勘测与设计,2017(3):78-81.
Song Rui. Analysis of Interface Design between Platform Screen Door and Signal Systems in Intercity Railways[J]. Railway Survey and Design, 2017(3): 78-81.
[6]周洋,李中华.地铁屏蔽门继电器在线监测与离线检测研究[J].铁路通信信号工程技术,2021,18(9):77-81.
Zhou Yang, Li Zhonghua.On-line Monitoring and Off-line Detection of Relays for Subway PSDs[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 77-81.
[7]龙时丹,陈志强,宋玉亮,等.高速铁路ATO系统门联动控制技术[J].装备制造技术,2020(10):92-95.
Long Shidan, Chen Zhiqiang, Song Yuliang, et al. Door Linkage Control Technology of High Speed Railway ATO System[J]. Equipment Manufacturing Technology, 2020(10): 92-95.
[8]胡俊.信号与站台门控制原理及故障探讨[J].工程技术,2019(1):315-316.
[9]徐效宁,易海旺,汪洋.城际铁路CTCS2+ATO列控系统的优化研究[J].铁道通信信号,2017,53(3):12-16.
Xu Xiaoning, Yi Haiwang, Wang Yang. Study on Optimization of CTCS2+ATO System for Intercity Railway [J]. Railway Signalling & Communication, 2017, 53(3): 12-16.