[1]钟国钢.浙江省都市圈城际铁路建设探讨[J].铁道建筑,2020,60(8):152-155.
Zhong Guogang. Discussion on Intercity Railway Construction in Zhejiang Metropolitan Area[J]. Railway Engineering, 2020, 60(8): 152-155.
[2]柏赟,周雨鹤,邱宇,等.长大下坡道区间地铁
列车节能操纵方法[J].中国铁道科学,2018,39(1):108-115.
Bai Yun, Zhou Yuhe, Qiu Yu, et al. Energy-Efficient Control Method for Subway Train in Section with Long Heavy down Grade[J]. China Railway Science, 2018, 39(1): 108-115.
[3]宋文婷,谭觅,蔡文川,等.高速列车的节能操纵策略研究[J].铁道科学与工程学报,2016,13(3):423-429.
Song Wenting, Tan Mi, Cai Wenchuan, et al. Research on Energy-Saving Operation Strategy for High-Speed Train[J]. Journal of Railway Science and Engineering, 2016, 13(3): 423-429.
[4]任啸宇.基于优化粒子群算法的列车节能策略研究[D].北京:北京交通大学,2015.
[5] Howlett P G, Pudney P J, Vu X. Local Energy Minimization in Optimal Train Control[J].Automatica, 2009, 45(11): 2692-2698.
[6]丁勇,刘海东,栢赟,等.地铁列车节能运行的
两阶段优化模型算法研究[J].交通运输系统工程与信息,2011,11(1):96-101.
Ding Yong, Liu Haidong, Bai Yun, et al. A Two-Level Optimization Model and Algorithm for Energy-Efficient Urban Train Operation[J]. Journal of Transportation Systems Engineering and Information Technology, 2011, 11(1): 96-101.
[7] Phil H. An Optimal Strategy for the Control of A Train[J]. The Journal of the Australian Mathematical Society Series B Applied Mathematics, 1990, 31(4): 454-471.
[8]丁文君.基于多目标决策的轨道交通ATO运行模式曲线优化研究[J].电子测量技术,2020,43(12):65-69.
Ding Wenjun. Research on Rail Traffic ATO Running Mode Curve Optimization Based on Multiple Targets Decision[J]. Electronic Measurement Technology, 2020, 43(12): 65-69.