Railway Signalling & Communication Engineering ›› 2022, Vol. 19 ›› Issue (2): 24-29.DOI: 10.3969/j.issn.1673-4440.2022.02.006
Previous Articles Next Articles
Liu Ning
Received:
Revised:
Online:
Published:
刘 宁
作者简介:
基金资助:
Abstract: The conventional high-speed iron tower scheme for the land section is no longer suitable for the scenario of the ultra-long sea-crossing bridge. From the perspective of engineering implementation, this paper proposes several feasible schemes for wireless solution and equipment arrangement suitable for the scenario of ultra-long sea-crossing bridge at the speed of 350 km/h by fully considering the interface with bridge and catenary professions. The research results can provide references for subsequent projects with this scenario.
Key words: high-speed railway, ultra-long sea-crossing bridge, wireless scheme
摘要: 陆地段常规的高铁塔方案已不适用于超长跨海大桥的场景。从工程可实施的角度出发,充分考虑与桥梁及接触网专业的接口,为350 km/h速度下的超长跨海大桥场景的无线方案及设备布置方式提出多个可行性方案。该研究成果可为后续存在该场景的工程提供参考。
关键词: 高速铁路, 超长跨海大桥, 无线方案
CLC Number:
U285
Liu Ning. Research on Wireless Schemes for Ultra-long Sea-crossing Bridge of High-speed Railway[J]. Railway Signalling & Communication Engineering, 2022, 19(2): 24-29.
刘 宁. 高速铁路超长跨海大桥无线方案研究[J]. 铁路通信信号工程技术, 2022, 19(2): 24-29.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://rsce.crscd.com.cn/EN/10.3969/j.issn.1673-4440.2022.02.006
https://rsce.crscd.com.cn/EN/Y2022/V19/I2/24