Zhang Ting. CTCS-2/3 Train Control Level Transition Method in
Special Line Scenario[J]. Railway Signalling & Communication Engineering, 2021, 18(10): 6-8,29.
[1]项守宽.特殊跨线场景下的CTCS-3至CTCS-2列控等级转换方法[J].铁道工程学报,2015,32(8):91-95.
Xiang Shoukuan. CTCS-3 to CTCS-2 Train Control System Level Transition Method in Specific Scenarios of Crossing the Line[J]. Journal of Railway Engineering Society, 2015, 32(8): 91-95.
[2]张敏慧,谢静高.高速铁路引入枢纽列控等级选择与应用的研究[J].铁路通信信号工程技术,2020,17(6):8-13.
Zhang Minhui, Xie Jinggao.Research on Selection of Train Control Levels and Application in Introducing High-Speed Railway Lines into Hubs[J]. Railway Signalling & Communication Engineering, 2020, 17(6): 8-13.
[3]谢兰英.京津城际天津枢纽列控系统升级改造设计方案探讨[J].铁路通信信号工程技术,2019,16(11):22-26.
Xie Lanying. Discussion on Upgrade Design Scheme for Train Control System of Beijing-Tianjin Intercity Railway[J]. Railway Signalling & Communication Engineering, 2019, 16(11): 22-26.
[4]李卫锋,刘立峰.特殊场景下列控等级转换的设置方案[J].铁道通信信号,2019,55(7):14-17.
Li Weifeng, Liu Lifeng. Setting Scheme of Train Control Level Transition in Special Scenarios[J]. Railway Signalling & Communication, 2019, 55(7): 14-17.
[5]陈果,袁楷智,陈舟劢.CTCS-2级与CTCS-3级列控设备对比研究[J].河南科技,2018(25):99-100.
Chen Guo, Yuan Kaizhi, Chen Zhoumai. Comparison between CTCS-2 and CTCS-3 Train Control Equipment[J]. Henan Science and Technology, 2018(25): 99-100.
[6]苏腾江.客运专线枢纽车站等级转换预告点设置方案[J].铁道通信信号,2017,53(10):33-35.
Su Tengjiang. Setting Scheme of Advance Notice Point for ATC Level Conversion at Junction Terminal Station in Passenger Dedicated Line[J]. Railway Signalling & Communication, 2017, 53(10): 33-35.