[1]陈杰,任哲宗,王茜,等.新一代安全型道岔控制电路研制[J].铁路通信信号工程技术,2024,21(2):103-107.
Chen Jie, Ren Zhezong, Wang Qian, et al. Development of New Generation of Safe Turnout Control Circuit[J]. Railway Signalling & Communication Engineering, 2024, 21(2): 103-107.
[2]崔明松.交流转辙机八线制道岔控制电路故障诊断分析方法[J].城市轨道交通研究,2023,26(9):191-194,198.
Cui Mingsong. AC Switch Machine Eight-Wire Turnout Control Circuit Fault Diagnosis and Analysis Method[J]. Urban Mass Transit, 2023, 26(9): 191-194, 198.
[3]占雪梅,楚彩虹.ZDJ9型道岔转辙机故障分析处理[J].郑州铁路职业技术学院学报,2023,35(1):35-37.
Zhan Xuemei, Chu Caihong.Fault Analysis and Treatment of ZDJ9 Switch Machine[J]. Journal of Zhengzhou Railway Vocational and Technical College, 2023, 35(1): 35-37.
[4]张辉.适用于四线制双机牵引控制电路的ZD9直流电动转辙机[J].铁路通信信号工程技术,2023,20(12):31-36.
Zhang Hui. ZD9 DC Electric Switch Machines Suitable for Four-wire Double-machine Driving Control Circuit[J]. Railway Signalling & Communication Engineering, 2023, 20(12): 31-36.
[5]胡婕,徐锦材,郭予广.ZD6型电动转辙机“接点反弹”的故障分析及预防[J].铁路通信信号工程技术,2023,20(11):106-111.
Hu Jie, Xu Jincai, Guo Yuguang. Fault Analysis and Prevention of “Contact Rebound” of ZD6 Electric Switch Machine[J].Railway Signalling & Communication Engineering, 2023, 20(11): 106-111.
[6]于秦龙.上海地铁智能运维平台的道岔设备管理[J].铁路通信信号工程技术,2023,20(3):57-62.
Yu Qinlong. Turnout Equipment Management Based on Intelligent Operation and Maintenance Platform of Shanghai Metro[J]. Railway Signalling & Communication Engineering, 2023, 20(3): 57-62.
[7]谢洪平.ZDJ9型转辙机电路故障处理[J].电子技术与软件工程,2014(16):156.
Xie Hongping. Fault Treatment of ZDJ9 Switch Machine Circuit[J]. Electronic Technology & Software Engineering, 2014(16): 156.
[8]张成标.道岔控制电路故障处理[C]//山东铁道学会.2009年山东省科协学术年会胶济客运专线相关技术研讨会论文集.济南铁路局电务处,2009:3.
[9]梁博伟.探究利用分线盘判断ZYJ7道岔控制电路故障的方法及原理[J].中国新通信,2020,22(2):157.
Liang Bowei. This Paper Discusses the Method and Principle of Judging the Fault of ZYJ7 Turnout Control Circuit by Using the Distribution Board[J]. China New Telecommunications, 2020, 22(2): 157.
[10]肖金山,夏荣斌,孔令刚.快速形状上下文算法在道岔控制电路故障诊断中的应用[J].铁道科学与工程学报,2019,16(8):2091-2099.
Xiao Jinshan, Xia Rongbin, Kong Linggang. Application of Fast Shape Context Algorithm in Fault Diagnosis of Switch Control Circuit[J]. Journal of Railway Science and Engineering, 2019, 16(8): 2091-2099.
[11]史宏力.ZYJ7型液压道岔控制电路故障分析[J].科技创新与应用,2020,10(10):119-120.
Shi Hongli. Fault Analysis of ZYJ7 Hydraulic Turnout Control Circuit[J]. Technology Innovation and Application, 2020, 10(10): 119-120.
[12]孙彬彬.ZYJ7电液道岔启动电路分析探讨[J].中国设备工程,2019(17):182-183.
Sun Binbin. Analysis and Discussion on Starting Circuit of ZYJ7 Electro-Hydraulic Turnout[J]. China Plant Engineering, 2019(17): 182-183.
[13]吴海平.ZYJ7液压道岔电路分析及故障维护处理[J].中国铁路,2016(11):68-72.
Wu Haiping. Circuit Analysis and Fault Maintenance of ZYJ7 Hydraulic Turnout[J]. China Railway, 2016(11): 68-72.
[14]张志军,齐红波,孟庆涛.铁路客运专线ZYJ7型液压道岔控制电路及故障分析[J].郑州铁路职业技术学院学报,2015,27(3):1-4.
Zhang Zhijun, Qi Hongbo, Meng Qingtao. Hydraulic Pressure Switch Control Circuit and Fault Analysis of Railway Passenger Dedicated Line ZYJ7 Type[J]. Journal of Zhengzhou Railway Vocational and Technical College, 2015, 27(3): 1-4.
[15]张华.ZYJ7电液转辙机控制电路故障探讨[J].哈尔滨铁道科技,2016(2):16-17.
Zhang Hua. Discussion on Control Circuit Fault of ZYJ7 Electro-Hydraulic Point Machine[J]. Harbin Railway Technology, 2016(2): 16-17.
[16]冯李,苏朗,邵晨,等.ZDJ9交流道岔控制电路及断线故障分析[J].中国设备工程,2019(8):35-36.
Feng Li, Su Lang, Shao Chen, et al. ZDJ9 AC Turnout Control Circuit and Breakage Fault Analysis[J]. China Plant Engineering, 2019(8): 35-36.
[17]樊哲宽.ZDJ9转辙机常见故障电路分析[J].通讯世界,2019,26(12):239-240.
Fan Zhekuan. Circuit Analysis of Common Faults of ZDJ9 Switch Machine[J]. Telecom World, 2019, 26(12): 239-240.
[18]王莲芝,耿正静.ZYJ7GZ型电液转辙机的创新与运用[J].城市轨道交通研究,2013,16(12):4.
Wang Lianzhi, Geng Zhengjing. Innovation and Application of ZYJ7GZ Type Rail Traffic Electro/Hydraulic Switch Machine[J]. Urban Mass Transit, 2013, 16(12): 4.
[19]汪川.浅谈ZYJ7电液转辙机道岔的维护与故障处理[J].甘肃科技,2013(3):3.
Meng Lin, Liu Dong. Discussion on Troubleshooting of S700K Switch Control Circuit Faults[J]. Railway Signalling & Communication Engineering, 2020, 17(5): 76-80.
[20]高利民,杨吉,杨树忠.五线制道岔控制电路故障诊断方法[J].中国铁路,2014(5):39-42.
Gao Linmin, Yang Ji, Yang Shuzhong. Diagnostic Method of Fine Line Switch Control Circuit[J]. Railway Signalling & Communication Engineering, 2020, 17(8): 73-77, 84.
[21]公吉鹏.新型有轨电车道岔控制方案分析[J].城市轨道交通研究,2014,17(7):119-121.
Gong Jipeng. Analysis of Moderntram Switch Controlling Scheme[J]. Urban Mass Transit, 2014, 17(7): 119-121.
|