[1]方明亮,卫旭初,严之伟.采用车地融合方式开展列控过分相计算研究[J].铁路通信信号工程技术,2023,20(1):1-6.
Fang Mingliang, Wei Xuchu, Yan Zhiwei. Research on Calculation for Passing through Neutral Sections in Trian Control by Applying Vehicle-Ground Integration Approach[J]. Railway Signalling & Communication Engineering, 2023, 20(1): 1-6.
[2]国家铁路局.铁路信号设计规范:TB 10007-2017[S].北京:中国铁道出版社,2017.
[3]国家铁路局.列控中心技术条件:TB/T 3439-2016[S].北京:中国铁道出版社,2016.
[4]李想,赵京京.铁路信号安全数据网网络管理系统优化方案研究[J].铁路通信信号工程技术,2023,20(12):26-30,42.
Li Xiang, Zhao Jingjing. Research on Optimization Scheme of Network Management System for Railway Vital Signaling Data Networks[J]. Railway Signalling & Communication Engineering, 2023, 20(12): 26-30, 42.
[5]张广军,张博.高铁接入既有铁路枢纽信号系统改造方案研究[J].铁道标准设计,2017,61(3):153-156,161.
Zhang Guangjun, Zhang Bo. Research on Upgrading Program for Access of High Speed Railway to Existing Railway Hub Signaling System[J]. Railway Standard Design, 2017, 61(3): 153-156, 161.
[6]王杰.通辽铁路枢纽内站(场)间信号结合设计处理措施[J].铁道标准设计,2012,56(10):105-108.
Wang Jie. Treatment Measures for Signalling Combination Design between Stations(Yards) within Tongliao Railway Terminal[J]. Railway Standard Design, 2012, 56(10): 105-108.
[7]王帅,薄天麒.铁路数据通信网网管系统安全防护的探索[J].魅力中国,2018(8):334.
[8]莫志松,郑升.高速铁路列车运行控制技术:CTCS-3级列车运行控制系统[M].北京:中国铁道出版社,2016.
[9]杨辉,周艳丽.高速铁路列车运行控制系统[M].北京:中国铁道出版社,2021.
[10]张卫军.铁路通信网络安全管理中心技术方案研究[J].中国安全科学学报,2019,29(Z2):88-92.
[11]邓伟龙.高速铁路引入枢纽信号系统优化设计[J].铁路通信信号工程技术,2024,21(1):16-20,35.
Deng Weilong. Optimization Design of Signaling System for Introducing High-Speed Railway Lines into Hubs[J]. Railway Signalling & Communication Engineering, 2024, 21(1): 16-20, 35.
[12]胡海龙.新建高铁引入既有枢纽信号系统工程方案优化与实践[J].低碳世界,2020,10(4):173-174.
[13]陈曦,谷业兴.高铁信号安全数据网更新改造分析[J].中国新通信,2019,21(5):157.
[14]王春尧.基于既有枢纽站改造对信号安全数据网的研究[J].信息与电脑(理论版),2018,30(24):161-163.
Wang Chunyao. Research on Connection Scheme of Signal Safety Data Network in Hub[J]. China Computer & Communication, 2018, 30(24): 161-163.
[15]袁卫东,贾华强,高建,等.新建高铁引入既有枢纽信号系统工程方案优化与实践[J].中国铁路,2019(12):47-52.
Yuan Weidong, Jia Huaqiang, Gao Jian, et al. Optimization and Practice of Incorporating Existing Hub into Newly-Built HSR Signaling System[J]. China Railway, 2019(12): 47-52.
[16]丁一.高速铁路CTCS-3级列控系统等级转换工程应用研究[J].铁道标准设计,2021,65(6):134-138.
Ding Yi. Research on the Engineering Application of the Level Transition of CTCS-3 Train Control System in High-Speed Railways[J]. Railway Standard Design, 2021, 65(6): 134-138.
[17]孔惠惠,苏梅.铁路枢纽客运线路共线段通过能力研究[J].中国铁路,2017(9):63-67.
Kong Huihui, Su Mei. Study on Passing Capacity of Mixed Traffic Section of Passenger Railways[J]. China Railway, 2017(9): 63-67.
[18]孟超迁.高铁信号安全数据网升级改造分析研究[J].上海铁道科技,2016(4):87-89.
[19]徐效宁,李辉,王菲,等.国铁与城轨列控系统互联互通的技术方案研究[J].铁道工程学报,2023,40(11):83-86,117.
Xu Xiaoning,Li Hui,Wang Fei,et al.Research on the Interoperation Scheme of National Railway and Urban Train Control System[J].Journal of Railway Engineering Society,2023, 40(11):83-86, 117.
[20]卢佩玲,郝韬,徐强.高铁联络线不利条件下CTCS3-CTCS2等级转换方案研究[J].铁道标准设计,2022,66(12):137-142.
Lu Peiling,Hao Tao,Xu Qiang.Research on CTCS3-CTCS2 Grade Conversion Scheme under Unfavorable Conditions of High-Speed Rail Tie Line[J].Railway Standard Design, 2022, 66(12):137-142.
[21]王菲.CTCS-2与CTCS-3级列车控制系统等级转换方案研究[J].工程建设与设计,2020(24):85-86.
Wang Fei.Study on the Conversion Scheme of CTCS-2 and CTCS-3 Train Control Systems[J].Construction & Design for Engineering,2020(24):85-86.
[22]曹雅鑫.CTCS-2至CTCS-3等级转换的研究及仿真[J].铁路计算机应用,2016,25(1):44-47.
Cao Yaxin.Level Transition from CTCS-2 to CTCS-3[J].Railway Computer Application, 2016, 25(1):44-47.
[23]袁钱磊,崔文杰.CTCS-3列车运行控制系统行车许可对列车运行影响分析[J].自动化应用,2021(7):147-149.
Yuan Qianlei,Cui Wenjie.Analysis of the Influence of CTCS-3 Train Operation Control System License on Train Operation[J].Automation Application, 2021(7):147-149.
[24]禹志阳,陈璞,杨宏图.自主化CTCS-3级列控系统关键技术研究与试验[J].中国铁路,2021(6):21-27.
Yu Zhiyang, Chen Pu, Yang Hongtu.Research and Test on Key Technologies of Independently Developed CTCS-3 Train Control System[J].China Railway, 2021(6):21-27.
|