Ouyang Zebang. Discussion on Design of Train Control System in Transformation of Complex Hubs[J]. Railway Signalling & Communication Engineering, 2024, 21(8): 35-40.
[1]中国国家铁路集团有限公司.列控中心技术条件:Q/CR 817-2021[S].北京:中国铁道出版社有限公司,2021.
[2]中国国家铁路集团有限公司.列控系统应答器应用技术条件:Q/CR 769-2020[S].北京:中国铁道出版社有限公司,2020.
[3]国家铁路局.CTCS-2级列控系统总体技术要求:TB/T 3516-2018[S].北京:中国铁道出版社,2018.
[4]中华人民共和国铁道部.高速铁路工程动态验收技术规范:TB 10761-2013[S].北京:中国铁道出版社,2013.
[5]中国铁路总公司.高速铁路联调联试及运行试验技术规范:Q/CR 472-2015[S].北京:中国铁道出版社,2013.
[6]中国铁路总公司.高速铁路联调联试及运行试验实施细则:铁总办[2013]107号[S].北京:中国铁路总公司,2013.
[7]谢兰英.京津城际天津枢纽列控系统升级改造设计方案探讨[J].铁路通信信号工程技术,2019,16(11):22-26,33.
Xie Lanying. Discussion on Upgrade Design Scheme for Train Control System of Beijing-Tianjin Intercity Railway[J]. Railway Signalling & Communication Engineering, 2019, 16(11): 22-26, 33.
[8]欧阳圣平.广深线信号系统升级改造技术[J].铁路通信信号工程技术,2022,19(8):32-35.
Ouyang Shengping. Upgrading Technology of Signalling System for Guangzhou-Shenzhen Railway[J]. Railway Signalling & Communication Engineering, 2022, 19(8): 32-35.
[9]解峰.合肥南动车所列车运行模式的研究[J].铁路通信信号工程技术,2022,19(6):34-39.
Xie Feng. Research on Train Operation Mode of Hefei South EMU Workshop[J]. Railway Signalling & Communication Engineering, 2022, 19(6): 34-39.
[10]邓伟龙.高速铁路引入枢纽信号系统优化设计[J].铁路通信信号工程技术,2024,21(1):16-20,35.
Deng Weilong.Optimization Design of Signalling System for Introducing High-Speed Railway Lines into Hubs[J]. Railway Signalling & Communication Engineering, 2024, 21(1): 16-20, 35.
[11]周志辉.重庆铁路枢纽东环线CTCS-2信号列控系统贯通方案研究[J].高速铁路技术,2021,12(1):70-74.
Zhou Zhihui. A Study on Scheme of CTCS-2 Train Control Level Penetration for East Circular Line of Chongqing Railway Junction[J]. High Speed Railway Technology, 2021, 12(1): 70-74.
[12]张广军,张博.高铁接入既有铁路枢纽信号系统改造方案研究[J].铁道标准设计,2017,61(3):153-156,161.
Zhang Guangjun, Zhang Bo. Research on Upgrading Program for Access of High Speed Railway to Existing Railway Hub Signaling System[J]. Railway Standard Design, 2017, 61(3): 153-156, 161.
[13]张海东.沿江高速铁路引入合肥铁路枢纽方案优化研究[J].铁道运输与经济,2021,43(1):102-107,120.
Zhang Haidong. Scheme Optimization of Connecting High-Speed Railway along the Yangtze River with Hefei Railway Hub[J]. Railway Transport and Economy, 2021, 43(1): 102-107, 120.
[14]张敏慧,谢静高.高速铁路引入枢纽列控等级选择与应用的研究[J].铁路通信信号工程技术,2020,17(6):8-13.
Zhang Minhui, Xie Jinggao. Research on Selection of Train Control Levels and Application in Introducing High-Speed Railway Lines into Hubs[J]. Railway Signalling & Communication Engineering, 2020, 17(6): 8-13.
[15]冯卫东.渝贵铁路贵阳枢纽列控系统技术方案探讨[J].铁道通信信号,2019,55(9):7-10.
Feng Weidong. Discussion on Technical Acheme of ATC System of Guiyang Junction Terminal in Chongqing-Guiyang Railway[J]. Railway Signalling & Communication, 2019, 55(9): 7-10.
[16]陈滨,周小辉.列控中心临时限速信息包[CTCS-2]编码方案研究[J].铁路通信信号工程技术,2023,20(12):7-13.
Chen Bin, Zhou Xiaohui. Research on Encoding Scheme of Balise Telegram [CTCS-2] for Temporary Speed Restriction of Train Control Center[J]. Railway Signalling & Communication Engineering, 2023, 20(12): 7-13.
[17]金润星.京沈客专接入沈阳枢纽列控系统方案研究[J].铁路通信信号工程技术,2018,15(10):76-81,90.
Jin Runxing. Train Control System Scheme for Introducing Beijing-Shenyang Dedicated Passenger Line to Shenyang Junction[J]. Railway Signalling & Communication Engineering, 2018, 15(10): 76-81, 90.