[1]周茂庆,陈卓,张宁,等.基于层次聚类的城轨设备维修方式决策研究[J].铁路通信信号工程技术,2021,18(4):52-58.
Zhou Maoqing, Chen Zhuo, Zhang Ning, et al. Research on Decision-Making of Maintenance Mode of Urban Rail Equipment Based on Hierarchical Clustering[J]. Railway Signalling & Communication Engineering, 2021, 18(4): 52-58.
[2]李夏洋.轨道电路智能运维技术[J].铁路通信信号工程技术,2023,20(S1):84-86,110.
Li Xiayang. Intelligent Operation and Maintenance Technology for Track Circuits[J]. Railway Signalling & Communication Engineering, 2023, 20(S1): 84-86, 110.
[3]郑庆元,路笃辉,刘勇明.单级离心泵机械密封维修周期及可靠性研究[J].机电工程,2023,40(6):960-966.
Zheng Qingyuan, Lu Duhui, Liu Yongming. Maintenance Cycle and Reliability for Mechanical Seal in Single-Stage Centrifugal Pump[J]. Journal of Mechanical & Electrical Engineering, 2023, 40(6): 960-966.
[4]钮海彦.地铁车辆预防性维修周期优化模型研究[J].城市轨道交通研究,2018,21(6):71-73.
Niu Haiyan. Research on Preventive Maintenance Period Optimization Model of Metro Door[J]. Urban Mass Transit, 2018, 21(6): 71-73.
[5]陈斌.高铁列控车载设备可靠性评估及维修决策方法研究[D].北京:北京交通大学,2020.
[6]逯红霞,张蕊萍,董海鹰.考虑故障相关性的风电机组维修策略[J].可再生能源,2020,38(4):477-483.
[7]陈红霞,郭春成,李宏悦,等.可靠性约束下的重型数控机床维修策略[J/OL].机床与液压,2023:1-7.(2023-05-17)[2023-08-07].https://kns.cnki.net/kcms/detail/44.1259.TH.20230517.1027.004.html.
[8]卢瑞冰.一种列控车载系统的优化与实现[J].铁路通信信号工程技术,2023,20(11):1-6.
Lu Ruibing. Optimization and Implementation of Train Control On-Board System[J]. Railway Signalling & Communication Engineering, 2023, 20(11): 1-6.
[9]徐汇淼.基于马尔可夫过程的ZPW-2000A轨道电路共因失效分析[J].铁路通信信号工程技术,2022,19(S1):27-31.
Xu Huimiao. Analysis of Common Cause Failure of ZPW-2000A Track Circuit Based on Markov Process[J]. Railway Signalling & Communication Engineering, 2022, 19(S1): 27-31.
[10]陈晓龙.基于故障树的25Hz轨道电路红光带故障分析及建议[J].铁路通信信号工程技术,2022,19(4):72-76.
Chen Xiaolong. Analysis and Suggestions on Red-Light Strap of 25 Hz Track Circuit Based on Fault Tree[J]. Railway Signalling & Communication Engineering, 2022, 19(4): 72-76.
[11]韩晓云,郝全睿,许烽,等.模块化多电平换流器的可靠性维修周期优化[J].高电压技术,2020,46(10):3429-3439.
Han Xiaoyun, Hao Quanrui, Xu Feng, et al. Optimization of Reliability Maintenance Cycle of Modular Multilevel Converter[J]. High Voltage Engineering, 2020, 46(10): 3429-3439.
[12]李彪,柴江涛,吴仕明,等.基于最小期望维修损失的风电机组部件定期维修策略研究[J].河北电力技术,2018,37(2):29-32.
Li Biao, Chai Jiangtao, Wu Shiming, et al. Maintenance Decision of Wind Turbines Based on Minimal Expected Cost[J]. Hebei Electric Power, 2018, 37(2): 29-32.
[13]杨静.地铁设备维护成本管控研究[D].南京:东南大学,2017.
[14]徐余明,黎家靖,张宁,等.基于云-边-端架构的城市轨道交通智能运维系统[J].都市快轨交通,2022,35(6):145-150,157.
Xu Yuming, Li Jiajing, Zhang Ning, et al. Intelligent Operation and Maintenance System of an Urban Rail Transit Based on Cloud-Edge-Terminal[J]. Urban Rapid Rail Transit, 2022, 35(6): 145-150, 157.
[15]徐余明,黎家靖,张宁,等.地铁自动检票机故障分析及可靠性研究[J].大连交通大学学报,2023,44(2):101-107.
Xu Yuming, Li Jiajing, Zhang Ning, et al. Failure Analysis and Reliability Research of Metro Automatic Gate Machine[J]. Journal of Dalian Jiaotong University, 2023, 44(2): 101-107.
[16]钟婧,刘华,徐永,等.基于统计模拟试验法的主机组故障周期分析[J].人民黄河,2019,41(5):117-121.
Zhong Jing, Liu Hua, Xu Yong, et al. Failure Period Analysis of Host Group Based on Statistical Simulation Test Method[J]. Yellow River, 2019, 41(5): 117-121.
[17]韩自强,岳文辉.机电设备系统可靠度和维护成本建模与仿真[J].机床与液压,2021,49(2):110-112,116.
Han Ziqiang, Yue Wenhui. Modelling & Simulation of System Reliability and Maintenance Cost for Electromechanical Equipment[J]. Machine Tool & Hydraulics, 2021, 49(2): 110-112, 116.
[18]黄健,陈景鹏,徐慧敏,等.发射场地面设备全寿命分段方法研究[J].中国安全科学学报,2017,27(12):37-42.
Huang Jian, Chen Jingpeng, Xu Huimin, et al. Study on Reliability-Based Segmentation of Lifetime of Ground Equipment in Launch Field[J]. China Safety Science Journal, 2017, 27(12): 37-42.
[19]陈能思,姚辉昌.基于K-S检验与改进mRMR的电力变压器故障诊断[J].电工技术,2022(5):48-53.
Chen Nengsi, Yao Huichang. Power Transformer Fault Diagnosis Based on K-S Test and Improved MRMR[J]. Electric Engineering, 2022(5): 48-53.
[20]黎家靖,张宁.基于环境影响的城轨设备预防性维修方法研究[J].铁道标准设计,2023,67(11):184-192.
Li Jiajing, Zhang Ning. Research on Preventive Maintenance Method of Urban Rail Equipment Based on Environmental Impact Factors[J]. Railway Standard Design, 2023, 67(11): 184-192.
[21]王海龙,张营,左付山.基于比例故障率模型的柴油发动机视情维修决策[J].科学技术与工程,2021,21(31):13299-13306.
Wang Hailong, Zhang Ying, Zuo Fushan. Condition-Based Maintenance Decision of Diesel Engine Based on Proportional Failure Rate Model[J]. Science Technology and Engineering, 2021, 21(31): 13299-13306.
[22]陈卓.城市轨道交通设备维修策略研究[D].南京:东南大学,2020.
|