Fu Zhi, Zhang Wenfei. Study on Signal Transition Processing Scheme of Sangzidian Station[J]. Railway Signalling & Communication Engineering, 2023, 20(9): 23-29.
[1]闫学文,朱文福.营业线站场改造过渡插入道岔的联锁电路处理方法[J].铁路通信信号工程技术,2008,5(3):47-48.
Yan Xuewen, Zhu Wenfu. Methods of Bringing Temporary Turnouts into Interlocking Circuit in Renovation Project[J]. Railway Signalling & Communication Engineering, 2008, 5(3): 47-48.
[2]童超.既有枢纽车站改造信号过渡道岔处理方案研究[J].铁道标准设计,2015,59(5):153-157.
Tong Chao. Research on Scheme of Signal Transition Switch Processing in Existing Hub Station Reconstruction[J]. Railway Standard Design, 2015, 59(5): 153-157.
[3]朱伦.烟台站轨道结构优化引起的道岔改造信号过渡方案探讨[J].铁路通信信号工程技术,2021,18(7):107-112.
Zhu Lun. Signaling Transition Scheme of Switch Transformation Caused by Rail Structure Optimization in Yantai Station[J]. Railway Signalling & Communication Engineering, 2021, 18(7): 107-112.
[4]杨光虎.既有线插铺道岔纳入联锁的几种解决方案[J].铁道通信信号,2009,45(12):36-37.
Yang Guanghu. Several Solutions for Interlocking Inserted Turnouts on Existing Lines[J]. Railway Signalling & Communication, 2009, 45(12): 36-37.
[5]中国国家铁路集团有限公司.国铁集团铁路营业线施工管理办法:TG/QT 102-2021[S].北京:中国铁道出版社,2021.
[6]许宾.道岔试验模拟条件在信号工程开通施工中的应用[J].铁路通信信号工程技术,2021,18(8):6-10.
Xu Bin.Application of Turnout Test Simulation Conditions in Commissioning Construction of Signaling Engineering[J].Railway Signalling & Communication Engineering,2021,18(8):6-10.
[7]钱怀武.昆明枢纽扩能改造昆明站岔改信号过渡方案研究[J].铁路通信信号工程技术,2017,14(1):84-87.
Qian Huaiwu. Signal Transition Engineering Design Scheme for Reconstruction of Kunming Junction[J]. Railway Signalling & Communication Engineering, 2017, 14(1): 84-87.
[8]李永辉.浅谈新铺道岔纳入既有信号联锁的过渡方案[J].铁路通信信号工程技术,2007,4(3):16-18.
Li Yonghui. Brief Discussion on Transit Scheme for Bringing Newly-Laid Points into Existing Signal Interlocking System[J]. Railway Signalling & Communication Engineering, 2007, 4(3): 16-18.