Zhao Yinlong. Analysis and Optimization of CTCS-3 Degradation Faults Caused by Abnormal Occupancy in GSM-R Line Crossing Area[J]. Railway Signalling & Communication Engineering, 2023, 20(1): 40-45.
[1]董丽.C3列控系统通信超时及降级运用的分析与措施[J].中国铁路,2017(12):45-50.
Dong Li. Fault Analysis and Corrective Measure for Communication Timeout and Downgrade Application in C3 Train Control System[J]. China Railway, 2017(12): 45-50.
[2]赵留俊.铁路并线区域GSM-R网络规划与关键问题分析[D].北京:北京交通大学,2011.
[3]林德志.CTCS-3级无线连接超时典型故障分析及措施[J].铁路通信信号工程技术,2020,17(4):51-56.
Lin Dezhi. Typical Fault Analysis and Measures for CTCS-3 Level Wireless Connection Timeout[J]. Railway Signalling & Communication Engineering, 2020, 17(4): 51-56.
[4]刘威壮.广湛高铁枢纽及交叉并线区段GSM-R网络规划研究[J].中国铁路,2021(5):131-136.
Liu Weizhuang. Research on GSM-R Network Planning for Guangzhou-Zhanjiang HSR Terminal and Crossing and Shared Sections[J]. China Railway, 2021(5): 131-136.
[5]梁冠民,王志强,王超.基于复杂线路条件下GSM-R网络优化的研究[J].铁道运营技术,2022,28(1):39-41.
Liang Guanmin, Wang Zhiqiang, Wang Chao.Optimization of GSM-R Networks under Complex Railway Lines[J]. Railway Operation Technology, 2022, 28(1): 39-41.
[6]代小虎.GSM-R同址双基站异常切换原因分析及其优化方案[J].铁路技术创新,2020(2):62-67.
Dai Xiaohu. Cause Analysis and Optimization Scheme for Abnormal Handover of GSM-R Same-Site Double Base Stations[J]. Railway Technical Innovation, 2020(2): 62-67.
[7]胡田立.GSM-R网络乒乓切换优化[J].铁路通信信号工程技术,2020,17(12):100-104.
Hu Tianli. Optimization of Ping-Pong Switching in GSM-R Network[J]. Railway Signalling & Communication Engineering, 2020, 17(12): 100-104.
[8]焦晓辉.铁路特殊区域GSM-R无线覆盖典型案例分析[J].铁道通信信号,2019,55(8):72-75.
Jiao Xiaohui. Typical Case Analysis of GSM-R Wireless Network Coverage in Special Railway Areas[J]. Railway Signalling & Communication, 2019, 55(8): 72-75.
[9]陶余永.高铁CTCS-3降级典型故障案例分析及优化措施[J].铁路通信信号工程技术,2021,18(7):25-29.
Tao Yuyong. Analysis of Typical Failure Cases and Optimization Measures for CTCS-3 Downgrading of High Speed Railway[J].Railway Signalling & Communication Engineering, 2021, 18(7): 25-29.