Shang Fangning. Analysis of Test Method of Small Track Section Incorporated into Interlocking[J]. Railway Signalling & Communication Engineering, 2022, 19(12): 98-100,113.
[1]中国铁路总公司.ZPW-2000A型无绝缘移频自动闭塞系统[M].北京:中国铁道出版社,2013.
[2]焦名,秦源.ZPW-2000A小轨道状态纳入列控中心防护方案[J].铁路通信信号工程技术,2017,14(4):8-10,19.
Jiao Ming, Qin Yuan. Protection Solution by Adding ZPW-2000A Small Track Condition in Train Control Center[J]. Railway Signalling & Communication Engineering, 2017, 14(4): 8-10, 19.
[3]王楠.列控中心增加小轨道状态检查功能及测试方法简析[J].铁路通信信号工程技术,2018,15(11):21-24.
Wang Nan. Analysis of Inspection Function and Testing Method of Small Track State Added in Train Control Center[J]. Railway Signalling & Communication Engineering, 2018, 15(11): 21-24.
[4]王尚斌.ZPW-2000A系统工程设计及维护[J].科技信息,2009(3):450-451.
[5]王志远.浅析ZPW-2000A一体化系统室内施工调试中的故障处理[J].铁路通信信号工程技术,2007,4(6):29-31.
Wang Zhiyuan. Analysis on Failure Processing in Installation and Testing Process of ZPW-2000A Indoor Equipment[J]. Railway Signalling & Communication Engineering, 2007, 4(6): 29-31.
[6]王建,张亚东.列控中心轨道电路编码的分析与实现[J].铁路计算机应用,2015,24(10):53-58.
Wang Jian, Zhang Yadong. Coded Track Circuit of Train Control Center[J]. Railway Computer Application, 2015, 24(10): 53-58.
[7]黄晓东,朱伟.ZPW-2000无绝缘轨道电路邻线干扰分析与处置[J].铁路通信信号工程技术,2020,17(3):101-104.
Huang Xiaodong, Zhu Wei. Analysis and Disposal of Adjacent Line Interference in ZPW-2000 Jointless Track Circuit[J]. Railway Signalling & Communication Engineering, 2020, 17(3): 101-104.