Jiang Shuang. Design Scheme of Multiple Successive Routes Based on Computer Interlocking[J]. Railway Signalling & Communication Engineering, 2022, 19(11): 20-23.
[1]中华人民共和国国家铁路局.铁路车站计算机联锁技术条件:TB/T 3027—2015[S].北京:中国铁道出版社,2016.
[2]何文卿.6502电气集中电路[M].2版.北京:中国铁道出版社,1997.
[3]傅世善.关于下坡道延续进路的来龙去脉[J].铁路通信信号工程技术,2006,3(3):58-60.
Fu Shishan. Context of Down Grade Successive Route[J]. Railway Signalling & Communication Engineering, 2006, 3(3): 58-60.
[4]于长洪.特殊站场延续进路解锁的处理[J].铁道通信信号,2001,37(9):26-27.
[5]周杰,李富山,张保银.大列通过下坡道延续进路后进路解锁的方法[J].铁道通信信号,2009,45(9):40.
Zhou Jie, Li Fushan, Zhang Baoyin. Route Releasing Approach When Long Train Running Through Down Ramp Successive Route[J]. Railway Signalling & Communication, 2009, 45(9): 40.
[6]李文涛.计算机联锁仿真试验自动执行平台研究[J].铁路通信信号工程技术,2022,19(1):1-6.
Li Wentao. Research on Automatic Execution Platform of Computer Based Interlocking Simulation Test[J].Railway Signalling & Communication Engineering, 2022, 19(1): 1-6.
[7]柴建华.浅谈6‰下坡道延续进路设计[J].铁道通信信号,2004,40(1):43.
[8]骆善平.6‰下坡道延续进路电路的探讨和改进[J].上海铁道科技,2005(2):49-50.
Luo Shanping. Research and Improvement on Time Delay Access Circuit for the Slope of 6‰[J]. Shanghai Railway Science & Technology, 2005(2): 49-50.
[9]郭永红.6‰下坡道延续进路设计问题分析[J].铁道通信信号,2007,43(9):26.