Railway Signalling & Communication Engineering ›› 2022, Vol. 19 ›› Issue (7): 116-120.DOI: 10.3969/j.issn.1673-4440.2022.07.023
Previous Articles
Yun Huimin, Liang Xiaobo
Received:
Revised:
Online:
Published:
贠慧敏,梁晓波
作者简介:
Abstract: In view of the situation that the length of the control cable between the home signal (or the receiving signal) and the signal tower is about 3 km in the railway hub or the special station with long throat section, the yellow-flash-yellow signal aspect is unstable or cannot be displayed normally. This paper analyzes and studies this problem from the perspective of engineering design, and puts forward the design optimization solution.
Key words: home signal, yellow-flash-yellow circuit, design optimization
摘要: 针对在铁路枢纽或咽喉区较长的特殊站场中,会出现进站信号机或接车进路信号机与信号楼间控制电缆长度约达3 km的情况,其黄闪黄信号显示存在不稳定或者不能正常开放的问题,从工程设计角度进行分析研究,提出设计优化解决方案。
关键词: 进站信号机, 黄闪黄电路, 设计优化
CLC Number:
U284
Yun Huimin, Liang Xiaobo. Design Optimization of Yellow-flash-yellow Circuits of Railway Hub Station Signal[J]. Railway Signalling & Communication Engineering, 2022, 19(7): 116-120.
贠慧敏, 梁晓波. 铁路枢纽站场信号黄闪黄电路设计优化[J]. 铁路通信信号工程技术, 2022, 19(7): 116-120.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://rsce.crscd.com.cn/EN/10.3969/j.issn.1673-4440.2022.07.023
https://rsce.crscd.com.cn/EN/Y2022/V19/I7/116