Welcome to Railway Signalling & Communication Engineering, Today is 中文

Railway Signalling & Communication Engineering ›› 2021, Vol. 18 ›› Issue (6): 31-37.DOI: 10.3969/j.issn.1673-4440.2021.06.007

Previous Articles     Next Articles

Research on Data Review Simulation and Supervision and Control of Train Operation Monitoring Device (LKJ)

Han Chengyan   

  1. Track Maintenance and Signaling Depot, China Railway Wuhan Group Co., Ltd., Wuhan 430071, China
  • Received:2020-08-13 Revised:2021-04-14 Online:2021-06-25 Published:2021-08-12

关于列车运行监控装置(LKJ)数据复核模拟及卡控环节的探索

韩成彦   

  1. 中国铁路武汉局集团有限公司工电检测所,武汉 430071

Abstract: In terms of the simulation and handover management of LKJ vehicle-mounted data source files, the existing working mode has become obsolete in the era of the rapid development of science and technology. It is an inevitable choice to improve the accuracy of on-board data and ensure the safety of transportation to realize the mapping of basic data data and verification results and the standardization of data control process in the process of data simulation.

Key words: LKJ vehicle-mounted basic data, simulation, mapping, management, standardization

摘要: LKJ车载数据源文件在模拟、交接管理过程中,既有的工作方式已与高速发展的科技时代脱节。探索数据模拟过程中实现基础数据资料与校核结果图谱化、数据管控流程规范化,是提高车载数据准确性和保障运输安全性的必然选择。

关键词: LKJ车载基础数据, 模拟, 图谱化, 管理, 规范化

CLC Number: