Welcome to Railway Signalling & Communication Engineering, Today is 中文

Railway Signalling & Communication Engineering ›› 2021, Vol. 18 ›› Issue (6): 51-58.DOI: 10.3969/j.issn.1673-4440.2021.06.011

Previous Articles     Next Articles

Scheme for Upgrading and Transformation of Video Monitoring System of Golmud-Lhasa Section of Qinghai-Tibet Railway

Liu Qinghua1,  Xu Hui2,  Wang Saichao2   

  1. 1. China Railway Qinghai-Tibet Group Co., Ltd., Xining 810007, China)
    (2. CRSC Research & Design Institute Group Co., Ltd., Beijing 100070, China
  • Received:2020-08-20 Revised:2021-04-23 Online:2021-06-25 Published:2021-08-12

关于青藏铁路格拉段视频监控系统更新改造方案的研究

刘清华1, 许 辉2, 王赛超2   

  1. 1.中国铁路青藏集团有限公司,西宁  810007;
    2.北京全路通信信号研究设计院集团有限公司,北京 100070

Abstract: This paper describes the current situation and problems in the video surveillance system of Golmud-Lhasa Section of Qinghai-Tibet Railway, analyzes user requirements and studies the scheme for upgrading and transformation.The scheme fully considers the selection of equipment in the plateau area and the safety and maintainability of the system, which can serve as a reference for the construction of video projects in areas with high altitudes and difficult maintenance in the future.

Key words: Qinghai-Tibet Railway, video system, scheme study

摘要: 阐述青藏铁路格拉段视频监控系统的现状和存在的问题,并对用户需求进行分析,针对系统存在的问题和用户需求对既有视频系统的更新改造方案进行研究。更新改造方案充分考虑高原地区设备的选型以及系统方案的安全性、可维护性,可为今后高海拔、维护难度较大地区视频工程的建设起到借鉴作用。

关键词: 青藏铁路, 视频系统, 方案研究

CLC Number: