Welcome to Railway Signalling & Communication Engineering, Today is 中文

Railway Signalling & Communication Engineering ›› 2021, Vol. 18 ›› Issue (9): 94-98.DOI: 10.3969/j.issn.1673-4440.2021.09.020

Previous Articles     Next Articles

Analysis and Treatment of Typical Problems in Dynamic Test After Train Control System Transformation of Conventional Speed Line

Wang Dianbiao,  Jia Haibin,  Liu Yaxi   

  1. Tangshan Signal & Communication Depot, China Railway Beijing Group Co., Ltd., Tangshan    063000, China
  • Received:2020-05-29 Revised:2021-06-07 Online:2021-09-24 Published:2021-10-13

普速线路列控改造后动态试验典型问题分析及处理

王殿彪,贾海斌,刘亚希   

  1. 中国铁路北京局集团有限公司唐山电务段, 河北唐山 063000

Abstract: The paper introduces in detail some typical problems of the train control system for high speed universal combination station during the dynamic test, and puts forward the solution and the related suggestion.

Key words: train control system, dynamic test, typical problems, analysis and treatment

摘要: 针对某高速普速结合车站的列控改造,介绍动态试验期间出现的列控系统典型问题,并提出解决方案及相关建议。

关键词: 列控系统, 动态试验, 典型问题, 分析及处理

CLC Number: