Welcome to Railway Signalling & Communication Engineering, Today is 中文

Railway Signalling & Communication Engineering ›› 2021, Vol. 18 ›› Issue (2): 18-21.DOI: 10.3969/j.issn.1673-4440.2021.02.004

Previous Articles     Next Articles

Discussion on Installation Position of Balise Antenna

Xu Xiaoning1,  Chu Yilangjun2,  Liu Lei1 ,  Zhu Jianshe1   

  1. 1. Signal & Communication Research Institute, China Academy of Railway Sciences Co., Ltd., Beijing    100081, China;
    2. Signal & Telecommunication Department, China Railway Shanghai Group Co., Ltd., Shanghai    200071, China
  • Received:2020-09-09 Revised:2021-01-15 Online:2021-02-25 Published:2021-08-17

关于应答器接收天线的安装位置探讨

徐效宁1,褚伊郎君2,刘 磊1,朱建设1   

  1. 1.中国铁道科学研究院集团有限公司通信信号研究所,北京 100081;
    2.中国铁路上海局集团有限公司电务部,上海 200071
  • 基金资助:
    中国国家铁路集团有限公司科技研究开发计划项目(J2019G014)

Abstract: This paper studies the relevant specifications of ETCS, and discusses the installation position of balise antenna in combination with the balise application principle of CTCS, so as to provide some reference for the installation standard of balise antenna in EMU and locomotive.

Key words: balise, antenna, ETCS, CTCS, EMU, locomotive

摘要: 研究ETCS的相关规范,结合CTCS应答器的应用原则,探讨应答器接收天线的安装位置,为应答器接收天线在动车组和机车的安装标准提供一定的参考。

关键词: 应答器, 天线, 欧洲列车运行控制系统, 中国列车运行控制系统, 动车组, 机车

CLC Number: