Research and Application of LKJ Data Wireless Reloading System
Chen Qinghua1, Wang Yeliu2, Yang Yibin2
1. Department of Track,Communication & Signaling and Power Supply, China State Railway Group Co., Ltd, Beijing 100844, China;
2. Hunan CRRC Times Communication Signal Co., Ltd, Changsha 410119, China
Chen Qinghua, Wang Yeliu, Yang Yibin. Research and Application of LKJ Data Wireless Reloading System[J]. Railway Signalling & Communication Engineering, 2021, 18(2): 7-13.
[1]中国铁路总公司.TG/XH208-2014 列车运行监控装置(LKJ)运用维护规则[S].北京:中国铁道出版社,2014.
[2]中华人民共和国铁道部.运基信号[2010]267号 关于印发铁路信号安全通信协议技术规范的通知[S].中华人民共和国铁道部,2010.
[3]邓永祁,杨将,邓国知.基于LMD和质量分析的机车周期检测管理系统[J].铁路通信信号工程技术,2020,17(6):30-34.
Deng Yongqi, Yang Jiang, Deng Guozhi. Locomotive Cycle Detection Management System Based on LMD and Quality Analysis[J]. Railway Signalling & Communication Engineering, 2020, 17(6): 30-34.
[4]欧盛芬,阳亦斌,杨将,等.基于Activiti工作流引擎的电务生产管理平台设计与实现[J].铁路通信信号工程技术,2020,17(6):50-55.
Ou Shengfen, Yang Yibin, Yang Jiang, et al. Design and Implementation of Signal and Communication Production Management Platform Based on Activiti Workflow Engine[J]. Railway Signalling & Communication Engineering, 2020, 17(6): 50-55.
[5]杨将,邓永祁,邓国知.基于RMI分布式的LMD系统性能优化与实现[J].铁路通信信号工程技术,2020,17(3):25-31.
Yang Jiang, Deng Yongqi, Deng Guozhi.Performance Optimization and Implementation of LMD System Based on RMI Distributed Technology[J]. Railway Signalling & Communication Engineering, 2020, 17(3): 25-31.
[6]詹志文,翁建辉,林维.LKJ基础数据管理及检验系统设计与实现[J].铁道运输与经济,2018,40(4):36-41.
Zhan Zhiwen, Weng Jianhui, Lin Wei. LKJ Basic Data Management and Inspection System Design and Implementation[J]. Railway Transport and Economy, 2018, 40(4): 36-41.
[7]王强.浅谈LKJ数据换装的过程控制[J].科技与创新,2014(16):141-142.
Wang Qiang. On LKJ Process Control Data Facelift[J]. Science and Technology & Innovation, 2014(16): 141-142.
[8]陈华锋,张志祥.LKJ数据换装管理及安全措施[J].铁路技术创新,2012(2):84-85.
[9]郑理华,李一楠,阳亦斌.LKJ车载数据无线远程换装系统设计[J].铁道运输与经济,2018,40(9):51-56.
Zheng Lihua, Li Yinan, Yang Yibin. A Design of LKJ Onboard Radio Remote Data Reloading System[J]. Railway Transport and Economy, 2018, 40(9): 51-56.