Application of BIM Technology in Operation and Maintenance of Railway Signal Engineering
Zhang Kai1, Song Shenglin2, Xiao Yanke3
1. Electricity Department, China Railway Beijing Bureau Group Co., Ltd., Beijing 100860, China;
2. Beijing Engineering & Electrical Overhaul Section, China Railway Beijing Bureau Group Co., Ltd., Beijing 100860, China;
3. Shanxi Xinxiang Information Technology Co., Ltd., Xi'an 710000, China
Zhang Kai, Song Shenglin, Xiao Yanke. Application of BIM Technology in Operation and Maintenance of Railway Signal Engineering[J]. Railway Signalling & Communication Engineering, 2021, 18(5): 15-21.
[1]朱超平,白雪,郑云水.BIM技术在铁路信号运维中的应用探讨[J].铁道通信信号,2017,53(11):17-19.
Zhu Chaoping, Bai Xue, Zheng Yunshui. Analysis of Application of BIM Technology in Railway Operation and Maintenace[J]. Railway Signalling & Communication, 2017, 53(11):17-19.
[2]赵晓东,黄维东.BIM技术在铁路信号可视化施工中的应用[J].铁道通信信号,2019,55(6):67-70.
Zhao Xiaodong, Huang Weidong. Application of BIM Technology in Visualized Construction of Railway Signalling System[J]. Railway Signalling & Communication, 2019, 55(6): 67-70.
[3]中国铁路BIM联盟.铁路工程实体结构分解指南(1.0版)[J].铁路技术创新,2014(6):5-334.
[4]中国铁路BIM联盟.铁路工程信息模型分类与编码标准:1.0版[J].铁路技术创新,2015(1):8-111.
[5]中国铁路BIM联盟.铁路四电工程信息模型数据存储标准[J].铁路技术创新,2016(5):11-77.
[6]铁路BIM联盟.铁路工程信息模型数据存储标准(1.0版)[J].铁路技术创新,2016(1):5-177.
[7]铁路BIM联盟.铁路工程信息模型交付精度标准:1.0版[J].铁路技术创新,2018(1):9-127.
[8]肖锦绣,关胜.基于BIM技术的铁路信号设计和运维平台研究[J].铁道通信信号,2019,55(2):38-41.
Xiao Jinxiu, Guan Sheng. Research on BIM-Based Platform for Design and Operation and Maintenance of Railway Signaling[J]. Railway Signalling & Communication, 2019, 55(2): 38-41.
[9]王亮,向伟彬,谭文举.BIM技术在地铁车站运维系统中的运用与研究[J].工程建设与设计,2020(5):102-104.
Wang Liang, Xiang Weibin, Tan Wenju.Application and Research of BIM Technology in Metro Station Operation and Maintenance System[J]. Construction & Design for Engineering, 2020(5): 102-104.
[10]周艳,张志.对BIM信息在项目全生命周期有效传递和共享的探讨[J].工程建设与设计,2018(18):257-258.
Zhou Yan, Zhang Zhi. Discussion on the Effective Transmission and Sharing of BIM Information in the Whole Life Cycle of the Project[J]. Construction & Design for Project, 2018(18): 257-258.