Implementation of Data Configuration Tool Based on All-electronic Platform
Zhang Wenjun1, Wang Tianming2
1. CRSC Research & Design Institute Group Co., Ltd., Beijing 100070, China;
2. Equipment Technology Center National Railway Administration, Beijing 100070, China
Zhang Wenjun, Wang Tianming. Implementation of Data Configuration Tool Based on All-electronic Platform[J]. Railway Signalling & Communication Engineering, 2021, 18(6): 15-.
[1]余云飞.铁路信号数据一体化配置系统设计及实现[J].铁路通信信号工程技术,2017,14(6):27-30.
Yu Yunfei. System Design and Implementation of Integrated Configuration of Railway Signal Data[J]. Railway Signalling & Communication Engineering, 2017, 14(6): 27-30.
[2]朱莹莹,王英波.信号设备数据配置工具在CBTC中的研究与实现[J].铁路通信信号工程技术,2019,16(9):61-64.
Zhu Yingying, Wang Yingbo. Research and Implementation of Signal Equipment Data Configuration Tool in CBTC System[J].Railway Signalling & Communication Engineering, 2019, 16(9): 61-64.
[3]林瑜筠,吕永昌.计算机联锁[M].4版.北京:中国铁道出版社,2017.
[4]付立民.全电子联锁开发和应用研究[J].铁路通信信号工程技术,2020,17(3):32-38.
Fu Limin. Research on Development and Application of Full Electronic Interlocking[J].Railway Signalling & Communication Engineering, 2020, 17(3): 32-38.
[5]国家铁路局.TB/T 3027-2015 铁路车站计算机联锁技术条件[S].北京:中国铁道出版社, 2016.
[6]何涛.轨道交通全电子化联锁系统安全技术研究与系统分析[D].兰州:兰州交通大学,2014.
[7]国家铁路局.TB/T 3482-2017 铁路车站计算机联锁安全原则[S].北京:中国铁道出版社, 2017.
[8]祁颖,谢千野,王一力.等侯筱岩简谈北京地铁房山线车辆段全电子联锁改造[J].铁路通信信号工程技术,2020,17(11):79-84.
Qi Ying, Xie Qianye, Wang Yili, et al. Discussion on Depot Reconstruction of Full Electronic Interlocking for Beijing Metro Fangshan Line[J]. Railway Signalling & Communication Engineering, 2020, 17(11): 79-84.