Zhang Quan. Research on Interference of Circuits for Garaging Locomotives to Nearby Track Circuits[J]. Railway Signalling & Communication Engineering, 2021, 18(3): 101-104.
[1]刘冠廷.用于机车移库的全桥式DC/DC电源的研究[D].株洲:湖南工业大学,2015.
[2]余立伟.UM71无绝缘轨道电路红光带及道床漏泄整治实践与思考[J].铁路通信信号工程技术,2017,14(4):98-101.
Yu Liwei. Improvement of Red-Light Strip and Ballast Resistance of UM71 Jointless Track Circuit[J]. Railway Signalling & Communication Engineering, 2017, 14(4): 98-101.
[3]韩旺.铁路双轨条轨道电路不平衡电流的探析[J].企业技术开发,2012,31(2):95-96.
Han Wang. Analysis of the Railway Double-Track Track Circuit Unbalanced Current[J]. Technological Development of Enterprise, 2012, 31(2): 95-96.
[4]王燕芩.电气化牵引回流对信号控制系统的干扰分析及防护研究[D].兰州:兰州交通大学,2012.
[5]钱觉时,徐姗姗,李美利,等.混凝土电阻率测量方法与应用[J].山东科技大学学报(自然科学版),2010,29(1):37-42.
Qian Jueshi, Xu Shanshan, Li Meili, et al. The Measurement and Application of Resistivity for Concrete[J]. Journal of Shandong University of Science and Technology (Natural Science), 2010, 29(1): 37-42.
[6]顾劭赓.浅谈SS3电力机车牵引入库装置地线施工技术[J].中国新技术新产品,2018(3):96-97.
[7]范学波.浅谈无砟轨道混凝土浇筑前的绝缘测试[J].铁路通信信号工程技术,2008,5(4):58-60.
Fan Xuebo. Discussion on Insulation Test of Ballastless Track before Concrete Pouring[J].Railway Signalling & Communication Engineering, 2008, 5(4): 58-60.
[8]李文.交流传动机车引车入库方式的选择[J].机车电传动,2007(2):69-70.
Li Wen. Selection of Ways to Lead AC Drive Locomotive Enter the Depot[J]. Electric Drive for Locomotives, 2007(2): 69-70.