Research on Level Crossing Function of European Train Control System in Baseline 3
Wang Jianmin1,2, Zhang Youbing1,2
1. CRSC Research & Design Institute Group Co., Ltd., Beijing 100070, China
2. Beijing Engineering Technology Research Center of Operation Control Systems for High Speed Railways, Beijing 100070, China
Wang Jianmin, Zhang Youbing. Research on Level Crossing Function of European Train Control System in Baseline 3[J]. Railway Signalling & Communication Engineering, 2021, 18(9): 5-8,37.
[1]赵泽.英标铁路项目中的平交道口系统设计方案研究[D].北京:北京交通大学,2015.
[2]邓卫升.ETCS及其在高速铁路中的应用[J].铁道通信信号,2006,42(6):31-33.
[3]范丽君.ETCS技术在列控系统中应用的探讨[J].中国铁道科学,2003,24(3):98-103.
Fan Lijun. Application of ERTMS/ETCS in Train Control System[J]. China Railway Science, 2003, 24(3): 98-103.
[4]肖代宁,刘红燕.国外高速铁路列车运行控制系统[J].铁道标准设计,2008,52(4):125-127.
[5]张友兵,刘岭,崔俊锋,等.ETCS DMI与CTCS DMI的对比分析[J].铁路通信信号工程技术,2017,14(2):9-13.
Zhang Youbing, Liu Ling, Cui Junfeng, et al. Comparison and Analysis of ETCS DMI and CTCS DMI[J]. Railway Signalling & Communication Engineering, 2017, 14(2): 9-13.
[6]张友兵,王建敏,陈志强.ETCS-2与CTCS-3在功能方面的差异性分析[J].铁路通信信号工程技术,2018,15(6):72-78.
Zhang Youbing, Wang Jianmin, Chen Zhiqiang.Analysis of Functional Differences between ETCS-2 System and CTCS-3 System[J]. Railway Signalling & Communication Engineering, 2018, 15(6): 72-78.
[7] ENISIG. Subset-026 System Requirements Specification[S]. Europe: ENISIG, 2016.
[8]张友兵,陈志强,王建敏,等.基线3 ETCS列控系统轨道条件指示方法[J].铁路通信信号工程技术,2020,17(8):28-32.
Zhang Youbing, Chen Zhiqiang, Wang Jianmin, et al. Indication Methods of Track Conditions in Baseline 3 ETCS Train Control System[J]. Railway Signalling & Communication Engineering, 2020, 17(8): 28-32.